Home › Engine / Hybrid System › HYBRID / BATTERY CONTROL › HYBRID BATTERY SYSTEM (for LITHIUM-ION BATTERY) › from 2020.05
RM3620E _51 Engine / Hybrid System _076333 HYBRID / BATTERY CONTROL _0425055 HYBRID BATTERY SYSTEM(for LITHIUM-ION BATTERY) C

HYBRID / BATTERY CONTROL  HYBRID BATTERY SYSTEM(for LITHIUM-ION BATTERY)  P056014  System Voltage (BATT) Circuit Short to Ground or Open  


DESCRIPTION

Auxiliary battery power is supplied to the BATT terminal of the battery ECU assembly in order to store DTCs and freeze frame data. Even if the power switch is turned off, back-up power is supplied.

DTC No. Detection Item DTC Detection Condition Trouble Area MIL Warning Indicate
P056014 System Voltage (BATT) Circuit Short to Ground or Open Malfunction in the battery ECU assembly back-up power source circuit
(1 trip detection logic)
·

Wire harness or connector

·

Battery ECU assembly

·

Fuse


Comes on Master Warning:
Comes on

CONFIRMATION DRIVING PATTERN

HINT:

After repair has been completed, clear the DTC and then check that the vehicle has returned to normal by performing the following All Readiness check procedure.

Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>HYBRID BATTERY SYSTEM (for LITHIUM-ION BATTERY)>UTILITY


1.

Connect the GTS to the DLC3.

2.

Turn the power switch on (IG) and turn the GTS on.

3.

Clear the DTCs (even if no DTCs are stored, perform the clear DTC procedure).

4.

Turn the power switch off and wait for 2 minutes or more.

5.

Turn the power switch on (IG) and turn the GTS on.

6.

With power switch on (IG) and wait for 5 seconds or more.

7.

Enter the following menus: Powertrain / HV Battery / Utility / All Readiness.

8.

Check the DTC judgment result.

HINT:
·

If the judgment result shows NORMAL, the system is normal.

·

If the judgment result shows ABNORMAL, the system has a malfunction.

·

If the judgment result shows INCOMPLETE, perform driving pattern again.




WIRING DIAGRAM

A378946E17
5.229,2.875 6.844,3.438 1.615,0.563 10 false Battery ECU Assembly 4.938,2.875 5.406,3.302 0.469,0.427 10 false z26 5.688,1.125 6.135,1.573 0.448,0.448 10 false AM 5.667,1.708 6.115,2.156 0.448,0.448 10 false GND 5.479,1.052 5.927,1.5 0.448,0.448 10 false 1 5.417,1.594 5.865,2.042 0.448,0.448 10 false 27 3.594,1.313 4.802,1.917 1.208,0.604 10 false ECU-B NO. 2 1.292,1.292 2.229,1.854 0.938,0.563 10 false MAIN 0.948,2.135 1.885,2.698 0.938,0.563 10 false Auxiliary 2.438,1 3.375,1.563 0.938,0.563 10 false 1 2.646,1 3.583,1.563 0.938,0.563 10 false 2 3.667,0.99 4.604,1.552 0.938,0.563 10 false 1 4.052,0.99 4.99,1.552 0.938,0.563 10 false 2 2.385,1.302 3.323,1.865 0.938,0.563 10 false J/B-B 0.948,2.323 1.885,2.885 0.938,0.563 10 false Battery

CAUTION / NOTICE / HINT

CAUTION:
·
A340358

Before the following operations are conducted, take precautions to prevent electric shock by turning the power switch off, wearing insulated gloves, and removing the service plug grip from HV battery.

-

Inspecting the high-voltage system

-

Disconnecting the low voltage connector of the inverter with converter assembly

-

Disconnecting the low voltage connector of the HV battery


·
A357588

To prevent electric shock, make sure to remove the service plug grip to cut off the high voltage circuit before servicing the vehicle.

·
A358042

After removing the service plug grip from the HV battery, put it in your pocket to prevent other technicians from accidentally reconnecting it while you are working on the high-voltage system.

·
A357589C02
1.573,0.74 2.021,0.427 true 2.094,0.344 2.354,0.51 0.26,0.167 10 false *a
*a Without waiting for 10 minutes


After removing the service plug grip, wait for at least 10 minutes before touching any of the high-voltage connectors or terminals. After waiting for 10 minutes, check the voltage at the terminals in the inspection point in the inverter with converter assembly. The voltage should be 0 V before beginning work.

Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>HYBRID BATTERY SYSTEM (for LITHIUM-ION BATTERY)>PRECAUTION

HINT:

Waiting for at least 10 minutes is required to discharge the high-voltage capacitor inside the inverter with converter assembly.




NOTICE:

After turning the power switch off, waiting time may be required before disconnecting the cable from the negative (-) auxiliary battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) auxiliary battery terminal notices before proceeding with work.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION


PROCEDURE

1.CHECK FUSE (ECU-B NO. 2)
a.
A373223C01
0.74,1.583 1.052,0.99 true 0.125,0.125 0.438,0.323 0.313,0.198 10 false *1 1.104,0.885 1.417,1.083 0.313,0.198 10 false *2
*1 Instrument Panel Junction Block Assembly
*2 ECU-B NO. 2 Fuse


Remove the ECU-B NO. 2 fuse from the instrument panel junction block assembly.


b.

Check if there is an open circuit in the ECU-B NO. 2 fuse in the instrument panel junction block assembly.

OK:

There is no open circuit in the ECU-B NO. 2 fuse.



c.

Install the ECU-B NO. 2 fuse.


Result:
Proceed to
OK
NG



OK

2.CHECK CONNECTOR CONNECTION CONDITION (BATTERY ECU ASSEMBLY)

NG

REPLACE FUSE (ECU-B NO. 2)

2.CHECK CONNECTOR CONNECTION CONDITION (BATTERY ECU ASSEMBLY)
CAUTION:

Be sure to wear insulated gloves and protective goggles.


a.

Check that the service plug grip is not installed.

NOTICE:

After removing the service plug grip, do not turn the power switch on (READY), unless instructed by the repair manual because this may cause a malfunction.




c.
C433532N01
2.188,0.823 2.604,1.073 0.417,0.25 2.271,0.854 2.563,1.052 0.292,0.198 10 true z26

Check the connector connections and contact pressure of the relevant terminals for the battery ECU assembly.

Click hereGeneral>INTRODUCTION>HOW TO TROUBLESHOOT ECU CONTROLLED SYSTEMS>ELECTRONIC CIRCUIT INSPECTION PROCEDURE

OK:

The connectors are connected securely and there are no contact pressure problems.



d.

Install the No. 1 HV battery hose.


Result:
Proceed to
OK
NG



OK

3.CHECK HARNESS AND CONNECTOR (AM VOLTAGE)

NG

CONNECT SECURELY

3.CHECK HARNESS AND CONNECTOR (AM VOLTAGE)
CAUTION:

Be sure to wear insulated gloves and protective goggles.


a.

Check that the service plug grip is not installed.

NOTICE:

After removing the service plug grip, do not turn the power switch on (READY), unless instructed by the repair manual because this may cause a malfunction.




c.
C433532N01
2.188,0.823 2.604,1.073 0.417,0.25 2.271,0.854 2.563,1.052 0.292,0.198 10 true z26

Disconnect the z26 battery ECU assembly connector.

NOTICE:

Before disconnecting the connector, check that it is not loose or disconnected.



d.

Connect the cable to the negative (-) auxiliary battery terminal.


e.
A407388C33
1.49,0.396 1.938,0.635 0.448,0.24 1.167,2.156 0.406,1.656 true 2.229,3.115 1.365,2.406 true 0.146,0.115 0.604,0.531 0.458,0.417 10 false *a 1.594,0.427 2.052,0.844 0.458,0.417 10 false z26 0.188,1.563 0.646,1.979 0.458,0.417 10 false AM 2.313,3.083 2.927,3.292 0.615,0.208 10 false GND
*a Front view of wire harness connector
(to Battery ECU Assembly)


Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition
z26-1 (AM) - z26-27 (GND) Power switch off 11 to 14 V


NOTICE:
·

Turning the power switch on (IG) with the service plug grip removed causes other DTCs to be stored. Clear the DTCs after performing this inspection.

·

If the power switch is turned on (IG) with the connectors disconnected, other DTCs will be stored. Be sure to clear the DTCs after the inspection.




f.

Disconnect the cable from the negative (-) auxiliary battery terminal.


g.

Reconnect the z26 battery ECU assembly connector.


h.

Install the No. 1 HV battery hose.


Result:
Proceed to
OK
NG



OK

NG

4.CHECK HARNESS AND CONNECTOR (ECU-B NO. 2 FUSE - BATTERY TERMINAL)
4.CHECK HARNESS AND CONNECTOR (ECU-B NO. 2 FUSE - BATTERY TERMINAL)
a.
A373224C10
0.208,0.698 0.521,0.896 0.313,0.198 10 false *2 0.083,0.073 0.396,0.271 0.313,0.198 10 false *1
*1 Instrument Panel Junction Block Assembly
*2 ECU-B NO. 2 Fuse Holder


Remove the ECU-B NO. 2 fuse from the instrument panel junction block assembly.


b.

Disconnect the cable from the negative (-) auxiliary battery terminal.


c.

Disconnect the cable from the positive (+) auxiliary battery terminal.


d.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
ECU-B NO. 2 fuse terminal 1 - Auxiliary battery positive (+) cable Power switch off Below 1 Ω
ECU-B NO. 2 fuse terminal 1 - Body ground Power switch off 10 kΩ or higher



e.

Connect the cable to the positive (+) auxiliary battery terminal.


f.

Connect the cable to the negative (-) auxiliary battery terminal.


g.

Install the ECU-B NO. 2 fuse to the instrument panel junction block assembly.


Result:
Proceed to
OK
NG



OK

REPAIR OR REPLACE HARNESS OR CONNECTOR (ECU-B NO. 2 FUSE - BATTERY ECU ASSEMBLY)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR (ECU-B NO. 2 FUSE - BATTERY TERMINAL)