Home › Engine / Hybrid System ยท 2UZ-FE › STARTING › STARTER

STARTER > INSTALLATION

for Preparation Click here



1. INSTALL STARTER ASSEMBLY


    A164439
  1. Connect the starter wire with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Connect the starter assembly connector.

  1. Connect the starter assembly to the cylinder block.

  1. Connect the ground wire with the bolt.

    Torque:
    17 N*m{ 173 kgf*cm , 13 ft.*lbf }

  1. Install the engine wire protector to the starter with the bolt.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }



    A164438
  1. Install the starter assembly with the 2 bolts.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }



2. INSTALL REAR WATER BY-PASS JOINT


    A185676E01
  1. Install the 2 new gaskets to the cylinder head.

    HINT:
    With the flat-bottom of each new gasket facing downward as shown in the illustration, install the 2 gaskets to the engine rear side.



    A185674
  1. Install the rear water by-pass joint with the 4 nuts.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }



3. INSTALL AIR TUBE


    A185673E01
  1. Install a new gasket to the air tube.

  1. Install the air tube with the 3 bolts.

    1. for bolt A

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    1. for bolt B

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }

  1. Install the No. 2 air hose with the clip.



4. INSTALL AIR PUMP ASSEMBLY (for Bank 1)
  1. Install the air pump assembly (Click here).



5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).