Home › Engine / Hybrid System ยท 2UZ-FE › ENGINE CONTROL › KNOCK SENSOR

KNOCK SENSOR > INSTALLATION

for Preparation Click here



1. INSTALL KNOCK SENSOR


    A185819E01
  1. Install the 2 knock sensors with the 2 nuts as shown in the illustration.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Connect the 2 knock sensor connectors.



2. INSTALL NO. 4 AIR INJECTION SYSTEM HOSE


    A185663E01
  1. Install the No. 1 air injection system hose as shown in the illustration.



3. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY
  1. Install a new O-ring to the water by-pass pipe sub-assembly.

  1. Apply soapy water to the O-ring.



    A162643
  1. Push in the water by-pass pipe sub-assembly.

  1. Connect the water by-pass pipe sub-assembly with the bolt.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

  1. Connect the connector clamp.



4. INSTALL INTAKE MANIFOLD ASSEMBLY
  1. Install the intake manifold (Click here).