Home › Vehicle Interior › SUPPLEMENTAL RESTRAINT SYSTEMS › CENTER AIRBAG SENSOR ASSEMBLY (w/ Cool Box)

CENTER AIRBAG SENSOR ASSEMBLY (w/ Cool Box) > INSTALLATION

for Preparation Click here


CAUTION:
Some of these service operations affect the SRS airbag system. Read the precautionary notices concerning the SRS airbag system before servicing (Click here).



1. INSTALL AIRBAG SENSOR ASSEMBLY
  1. Confirm that the ignition switch is turned off.

  1. Confirm that the negative battery terminal is disconnected.

    CAUTION:
    1. Confirm that the negative battery terminal is disconnected before performing the operation. Even an impact to only the airbag sensor will cause the airbag to deploy.
    2. Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to disable the SRS system.

  1. Install the airbag sensor with the 3 bolts.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

    NOTICE:
    1. Do not use an airbag sensor that has been dropped.
    2. Do not subject the airbag sensor to any impact or force.
    3. Confirm that the carpet does not interfere with the installation plane.

  1. Confirm that there is no looseness by shaking the front airbag sensor.



    B192368E02
  1. Connect the connector holder to lock the lever.
    Text in Illustration 
    *1
    Lever

    NOTICE:
    Confirm that the lever is locked.

  1. Confirm that the drip-proof sheet has not been removed and does not cut into the connectors.



2. INSTALL FRONT CONSOLE BOX
  1. Install the front console box with the 5 screws and 2 clips.

  1. Attach the 2 clamps.



3. INSTALL REAR CONSOLE BOX ASSEMBLY
  1. Attach the 6 claws to install the rear console box.

  1. Install the 2 screws and 4 bolts.

  1. Connect the 2 connectors.



4. INSTALL COOLING BOX ASSEMBLY
  1. Attach the 4 clips and claw and install the cooling box assembly.

  1. Install 4 new No. 1 cool box packings.

  1. Install the 4 bolts.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Connect the 3 connectors.



5. INSTALL COOLING BOX TRAY
  1. Install the cooling box tray.



6. CONNECT AIR CONDITIONER TUBE AND ACCESSORY ASSEMBLY
  1. Remove the attached vinyl tape from the air conditioner tube and accessory assembly.

  1. Sufficiently apply compressor oil to 2 new O-rings and to the fitting surface of the cooling box assembly.

    Compressor oil:
    ND-OIL 8 or equivalent

  1. Install the 2 O-rings on the air conditioner tube and accessory assembly.

  1. Connect the air conditioner tube and accessory assembly to the cooling box assembly with the 2 bolts.

    Torque:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }



7. INSTALL REAR UPPER CONSOLE PANEL SUB-ASSEMBLY
  1. Connect the connectors.

  1. Attach the 6 clips to install the console panel.

  1. Install the clip.



8. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY
  1. Attach the 12 clips to install the console panel.



9. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY


    B167312
  1. Install the shift lever knob and twist it in the direction indicated by the arrow.



10. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY LH
  1. Attach the 2 claws to install the sensor.

  1. Connect the connectors.

  1. Attach the 9 clips and claw to install the finish panel.

  1. Install the 2 <A> bolts.



11. INSTALL HOOD LOCK CONTROL LEVER SUB-ASSEMBLY


    B192511
  1. Connect the hood lock control cable assembly to the hood lock control lever sub-assembly.

  1. Attach the 3 claws to install the hood lock lever



12. INSTALL INSTRUMENT SIDE PANEL LH


    B229058
  1. Attach the 7 claws to install the side panel.



13. INSTALL FRONT DOOR OPENING TRIM WEATHERSTRIP LH

HINT:
Use the same procedure for both sides.



14. INSTALL COWL SIDE TRIM BOARD LH

HINT:
Use the same procedure for both sides.



15. INSTALL FRONT DOOR SCUFF PLATE LH

HINT:
Use the same procedure for both sides.



16. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

Torque:
5.4 N*m{ 55 kgf*cm , 48 in.*lbf }



17. INSPECT SRS WARNING LIGHT
  1. Inspect the SRS warning light (Click here).



18. CHARGE REFRIGERANT



I100449E02

NOTICE:
Charge refrigerant in accordance with the equipment manual.

  1. Perform vacuum purging using a vacuum pump.

  1. Charge refrigerant HFC-134a (R134a).

    SST
    09985-20010   (09985-02010, 09985-02050, 09985-02060, 09985-02070, 09985-02080, 09985-02090, 09985-02110, 09985-02130, 09985-02140, 09985-02150)

    Standard:
    Cool Box
    Refrigerant Charging Amount
    w/ Cool Box
    1080 to 1140 g (38.1 to 40.2 oz.)
    w/o Cool Box
    920 to 980 g (32.4 to 34.6 oz.)

    NOTICE:
    Do not start the engine before charging it with refrigerant as the cooler compressor does not work properly without sufficient refrigerant. This could cause the compressor to overheat.

    HINT:

    1. The relationship between the refrigerant charge amount and the pressure is as follows.


      I103968E01

    2. High Charge Range:
      If the refrigerant is overcharged, the pressure rises on the high-pressure side. High-pressure cut off frequently occurs. This causes insufficient cooling performance and also insufficient compressor lubrication.
    3. Low Charge Range:
      A shortage of refrigerant causes insufficient cooling performance and low circulation of refrigerant oil, which shortens the compressor life. Operation with insufficient coolant raises the refrigerant temperature and causes heat deterioration of the rubber seals and hoses. Cracking and subsequent refrigerant leakage may occur.


    1. Install the caps onto the service valves on the refrigerant line.



19. WARM UP ENGINE

NOTICE:
Warm up the engine at less than 2000 rpm for 1 minute or more after charging it with refrigerant.



20. INSPECT REFRIGERANT LEAK
  1. After recharging the refrigerant gas, check for refrigerant gas leakage using a halogen leak detector.

  1. Perform the operation as follows:

    1. Stop the engine.
    2. Secure good ventilation (the halogen leak detector may react to volatile gases other than refrigerant, such as evaporated gasoline or exhaust gas).
    3. Repeat the test 2 or 3 times.
    4. Make sure that some refrigerant remains in the refrigeration system.
      When the compressor is off: approximately 392 to 588 kPa (4 to 6 kgf/cm2, 57 to 85 psi)

    HINT:
    It is impossible for the above pressure to be maintained if there is leakage.



    I042222E14
  1. Using the halogen leak detector, check the refrigerant line, especially at the connection points, for leakage.

  1. If no gas leakage is detected from the drain hose, remove the blower motor from the cooling unit. Insert the halogen leak detector sensor into the unit and perform the test.

  1. Disconnect the pressure switch connector and leave it for approximately 20 minutes. Bring the halogen leak detector close to the pressure switch and perform the test.