NAVIGATION ANTENNA > INSTALLATION |
| 1. INSTALL NAVIGATION ANTENNA ASSEMBLY |
![]() |
Install the antenna with the 2 screws.
Attach the clamp.
| 2. INSTALL DEFROSTER NOZZLE ASSEMBLY |
Install the defroster nozzle with the 3 <G> or <H> screws.
| 3. INSTALL NO. 1 SIDE DEFROSTER NOZZLE DUCT |
Attach the 2 claws to install the duct.
Install the 2 <G> or <H> screws.
| 4. INSTALL NO. 2 SIDE DEFROSTER NOZZLE DUCT |
Attach the 2 claws to install the duct.
Install the 2 <G> or <H> screws.
| 5. INSTALL NO. 1 HEATER TO REGISTER DUCT |
Install the duct with the 5 <G> or <H> screws.
Attach the clamp.
| 6. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY |
| 7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 8. CHECK SRS WARNING LIGHT |