REMOVAL
| Symbol Meaning | |
|---|---|
|
Remove Weld Points |
|
Cut and Join Location |
|
Cut Location for Supply Parts |
Remove the quarter lock pillar reinforcement at the same time.
| *1 | Quarter Lock Pillar Reinforcement | - | - |
| *a | mm (in.) | - | - |
INSTALLATION
| Symbol Meaning | |
|---|---|
|
Spot Weld |
|
Plug Weld |
|
Cut and Join Location |
|
Butt Weld |
|
Body Sealer |
Before temporarily installing the new parts, weld the quarter lock pillar reinforcement and fuel inlet box plate with the standard number of welding points.
Inspect the fitting of the related parts around the new parts before welding. This affects the appearance of the finish.
Temporarily install the new parts and measure each part of the new parts in accordance with the body dimension diagram. (See the body dimensions)
Before installing a new part, apply body sealer.
Apply body sealer evenly about 5 mm (0.20 in.) from the flange, avoiding any oozing.
Apply sealer evenly, about 3 to 4 mm (0.12 to 0.16 in.) in diameter.
After welding, apply foamed sealing material to the corresponding parts. (See the painting / coating)
After welding, apply body sealer to the corresponding parts. (See the painting / coating)
After applying the top coat, apply anti-rust agent to the internal panel portion of the closed section structural weld points.
| *1 | Fuel Inlet Box Plate | *2 | Quarter Lock Pillar Reinforcement |
| *3 | Fuel Filler Opening Lid | *4 | Rivets |
| *a | mm (in.) | - | - |
| *a | mm (in.) | - | - |