Home › Engine / Hybrid System › 3UR-FE EMISSION CONTROL › PURGE VALVE
RM27L0U _51 Engine / Hybrid System _049300 3UR-FE EMISSION CONTROL _0235597 PURGE VALVE A

3UR-FE EMISSION CONTROL  PURGE VALVE  INSTALLATION  


PROCEDURE

Hide 25860 1.INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY

a.
A158655E01
1.385,2.273 1.795,2.454 0.409,0.180 10 Upper

Install the No. 1 vacuum switching valve assembly with the bolt.

Torque:
21 N*m (214 kgf*cm, 16 ft.*lbf)


b.

Connect the connector.


Hide 23829A 2.CONNECT PURGE LINE HOSE

a.

Connect the 2 hoses.

HINT:

Turn the clip claw to the upper side.