Home › Drivetrain › AB60E AUTOMATIC TRANSMISSION / TRANSAXLE › VALVE BODY ASSEMBLY
RM27L0U _52 Drivetrain _049311 AB60E AUTOMATIC TRANSMISSION / TRANSAXLE _0235662 VALVE BODY ASSEMBLY G

AB60E AUTOMATIC TRANSMISSION / TRANSAXLE  VALVE BODY ASSEMBLY  INSPECTION  


PROCEDURE

Hide 1.INSPECT SHIFT SOLENOID VALVE SL1

a.
C351966E03
1.833,1.271 2.313,1.021 true 1.521,1.281 1.052,1.021 true 1.823,3.177 2.302,2.927 true 1.521,3.188 1.073,2.948 true 0.052,0.073 2.521,0.427 2.469,0.354 10 false Component without harness connected: (Shift Solenoid Valve SL1) 0.917,0.917 1.146,1.094 0.229,0.177 10 false 2 0.917,2.823 1.146,3 0.229,0.177 10 false 2 2.375,0.906 2.583,1.083 0.208,0.177 10 false 1 2.375,2.823 2.583,3 0.208,0.177 10 false 1 1.208,4.26 1.438,4.438 0.229,0.177 10 false (-) 2.021,4.271 2.25,4.448 0.229,0.177 10 false (+)

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
1 - 2 20°C (68°F) 5.0 to 5.6 Ω



b.

Connect the battery positive (+) lead with a 21 W bulb to terminal 1 and the negative (-) lead to terminal 2 of the solenoid valve connector. Then check that the valve moves and makes an operating noise.

NOTICE:

Do not connect the battery for more than 1 minute, because doing so will apply an overcurrent to the solenoid.


OK:

Valve moves and makes operating noise.


If the result is not as specified, replace the solenoid valve.


Hide 2.INSPECT SHIFT SOLENOID VALVE S1

a.
C160563E01
1.71,0.819 1.941,1.002 0.231,0.184 10 (-) 0.056,0 1.633,0.186 1.577,0.186 10 Shift Solenoid Valve S1: 2.477,0.819 2.709,1.002 0.231,0.184 10 (+)

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
Shift solenoid valve S1 connector terminal - Shift solenoid valve S1 body 20°C (68°F) 11 to 15 Ω



b.

Connect the battery positive (+) lead to the terminal of the solenoid valve connector, and the negative (-) lead to the solenoid valve body. Then check that the valve moves and makes an operating noise.

OK:

Valve moves and makes operating noise.


If the result is not as specified, replace the solenoid valve.


Hide 3.INSPECT SHIFT SOLENOID VALVE S2

a.
C160564E01
2.349,0.818 2.580,1.001 0.231,0.184 10 (+) 0.056,0 1.633,0.186 1.577,0.186 10 Shift Solenoid Valve S2: 3.116,0.818 3.347,1.001 0.231,0.184 10 (-)

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
Shift solenoid valve S2 connector terminal - Shift solenoid valve S2 body 20°C (68°F) 11 to 15 Ω



b.

Connect the battery positive (+) lead to the terminal of the solenoid valve connector, and the negative (-) lead to the solenoid valve body. Then check that the valve moves and makes an operating noise.

OK:

Valve moves and makes operating noise.


If the result is not as specified, replace the solenoid valve.


Hide 4.INSPECT SHIFT SOLENOID VALVE S3

a.
C160563E02
1.71,0.819 1.941,1.002 0.231,0.184 10 (-) 0.056,0 1.633,0.186 1.577,0.186 10 Shift Solenoid Valve S3: 2.477,0.819 2.709,1.002 0.231,0.184 10 (+)

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
Shift solenoid valve S3 connector terminal - Shift solenoid valve S3 body 20°C (68°F) 11 to 15 Ω



b.

Connect the battery positive (+) lead to the terminal of the solenoid valve connector, and the negative (-) lead to the solenoid valve body. Then check that the valve moves and makes an operating noise.

OK:

Valve moves and makes an operating noise.


If the result is not as specified, replace the solenoid valve.


Hide 5.INSPECT SHIFT SOLENOID VALVE S4

a.
C123198E03
1.644,0.82 1.876,1.003 0.231,0.184 10 (-) 0.055,0 1.632,0.186 1.577,0.186 10 Shift Solenoid Valve S4: 2.412,0.82 2.643,1.003 0.231,0.184 10 (+)

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
Shift solenoid valve S4 connector terminal - Shift solenoid valve S4 body 20°C (68°F) 11 to 15 Ω



b.

Connect the battery positive (+) lead to the terminal of the solenoid valve connector, and the negative (-) lead to the solenoid valve body. Then check that the valve moves and makes an operating noise.

OK:

Valve moves and makes an operating noise.


If the result is not as specified, replace the solenoid valve.


Hide 6.INSPECT SHIFT SOLENOID VALVE SL2

a.
C351966E05
1.833,1.271 2.313,1.021 true 1.521,1.281 1.052,1.021 true 1.823,3.177 2.302,2.927 true 1.521,3.188 1.073,2.948 true 0.052,0.031 2.521,0.385 2.469,0.354 10 false Component without harness connected: (Shift Solenoid Valve SL2) 0.917,0.917 1.146,1.094 0.229,0.177 10 false 2 0.917,2.823 1.146,3 0.229,0.177 10 false 2 2.375,0.906 2.583,1.083 0.208,0.177 10 false 1 2.375,2.823 2.583,3 0.208,0.177 10 false 1 1.208,4.26 1.438,4.438 0.229,0.177 10 false (-) 2.021,4.271 2.25,4.448 0.229,0.177 10 false (+)

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
1 - 2 20°C (68°F) 5.0 to 5.6 Ω



b.

Connect the battery positive (+) lead with a 21 W bulb to terminal 1 and the negative (-) lead to terminal 2 of the solenoid valve connector. Then check that the valve moves and makes an operating noise.

NOTICE:

Do not connect the battery for more than 1 minute, because doing so will apply an overcurrent to the solenoid.


OK:

Valve moves and makes an operating noise.


If the result is not as specified, replace the solenoid valve.


Hide 7.INSPECT SHIFT SOLENOID VALVE SR

a.
C160565E01
2.349,0.818 2.580,1.002 0.231,0.184 10 (+) 0.056,0 1.633,0.186 1.577,0.186 10 Shift Solenoid Valve SR: 3.116,0.818 3.347,1.002 0.231,0.184 10 (-)

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
Shift solenoid valve SR connector terminal - Shift solenoid valve SR body 20°C (68°F) 11 to 15 Ω



b.

Connect the battery positive (+) lead to the terminal of the solenoid valve connector, and the negative (-) lead to the solenoid valve body. Then check that the valve moves and makes an operating noise.

OK:

Valve moves and makes an operating noise.


If the result is not as specified, replace the solenoid valve.


Hide 8.INSPECT SHIFT SOLENOID VALVE SLT

a.
C351967E04
1.125,0.99 1.531,1.25 true 2.281,1 1.885,1.25 true 2.281,2.979 1.885,3.229 true 1.125,2.969 1.531,3.229 true 0.063,0.063 2.5,0.406 2.438,0.344 10 false Component without harness connected: (Shift Solenoid Valve SLT) 1,0.906 1.104,1.104 0.104,0.198 10 false 2 2.313,0.917 2.417,1.115 0.104,0.198 10 false 1 1.01,2.865 1.115,3.063 0.104,0.198 10 false 2 2.313,2.896 2.417,3.094 0.104,0.198 10 false 1 1.271,4.344 1.49,4.542 0.219,0.198 10 false (+) 1.99,4.344 2.156,4.542 0.167,0.198 10 false (-)

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
1 - 2 20°C (68°F) 5.0 to 5.6 Ω



b.

Connect the battery positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector. Then check that the valve moves and makes an operating noise.

NOTICE:

Do not connect the battery for more than 1 minute, because doing so will apply an overcurrent to the solenoid.


OK:

Valve moves and makes an operating noise.


If the result is not as specified, replace the solenoid valve.


Hide 9.INSPECT SHIFT SOLENOID VALVE SLU

a.
C351967E02
1.125,0.99 1.531,1.25 true 2.281,1 1.885,1.25 true 2.281,2.979 1.885,3.229 true 1.125,2.969 1.531,3.229 true 0.063,0.063 2.5,0.406 2.438,0.344 10 false Component without harness connected: (Shift Solenoid Valve SLU) 1,0.906 1.104,1.104 0.104,0.198 10 false 2 2.313,0.917 2.417,1.115 0.104,0.198 10 false 1 1.01,2.865 1.115,3.063 0.104,0.198 10 false 2 2.313,2.896 2.417,3.094 0.104,0.198 10 false 1 1.271,4.344 1.49,4.542 0.219,0.198 10 false (+) 1.99,4.344 2.156,4.542 0.167,0.198 10 false (-)

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
1 - 2 20°C (68°F) 5.0 to 5.6 Ω



b.

Connect the battery positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector. Then check that the valve moves and makes an operating noise.

NOTICE:

Do not connect the battery for more than 1 minute, because doing so will apply an overcurrent to the solenoid.


OK:

Valve moves and makes an operating noise.


If the result is not as specified, replace the solenoid valve.