04371G
1.INSTALL FRONT PROPELLER SHAFT UNIVERSAL J0INT SPIDER
Apply MP grease to a new universal joint spider and universal joint spider bearings.
Be careful not to apply too much grease.
Measure dimension A between the snap ring grooves.
Install the universal joint spider bearing into the universal joint spider and measure dimension B.
When measuring dimension B, clamp the universal joint spider and universal joint spider bearing in a vise to hold them together.
Select hole snap rings of the correct thickness to make dimensions A and B the same.
| Color | Thickness mm (in.) |
|---|---|
| Green | 1.384 mm (0.0545 in.) |
| Red | 1.435 mm (0.0565 in.) |
| Black | 1.486 mm (0.0585 in.) |
| Copper | 1.511 mm (0.0595 in.) |
| Silver | 1.537 mm (0.0605 in.) |
| Yellow | 1.588 mm (0.0625 in.) |
| Blue | 1.638 mm (0.0645 in.) |
Use new snap rings.
If possible, use snap rings of the same thickness for both edges.
Insert the universal joint spider into the universal joint flange yoke, and then using SST, press in the universal joint spider bearing into the snap ring groove.
When pressing in the universal joint spider bearing, be careful not to damage its lip.
Use the same installation procedure for the universal joint spider bearing on the opposite side.
Using needle-nose pliers, install new hole snap rings into the snap ring grooves of the yoke.
2.INSPECT PROPELLER SHAFT GREASE FITTING DIRECTION
When replacing a spider bearing, be sure that the grease fitting hole is facing the direction shown in the illustration.
3.INSPECT UNIVERSAL JOINT SPIDER BEARING