75561A
1.INSTALL ROOF DRIP SIDE FINISH MOULDING CLIP
Only follow this procedure when replacing the clips.
Remove the tape that remains on the moulding surface of the vehicle body, and then clean the surface with a non-residue solvent.
Using an infrared light, heat the clip installation surface on the vehicle body and roof drip side finish moulding.
| Area | Temperature |
|---|---|
| Vehicle Body | 40 to 60°C (104 to 140°F) |
| Roof Drip Side Finish Moulding | 20 to 30°C (68 to 86°F) |
Do not excessively heat the vehicle body or roof drip side finish moulding.
Install new clips in the positions shown in the illustration. Press in the clips by hand.
| Area | Measurement |
|---|---|
| a | 4.7 mm (0.185 in.) |
| b | 5.1 mm (0.201 in.) |
| c | 4.7 mm (0.185 in.) |
| d | 5.0 mm (0.197 in.) |
After pressing in the clips, wait 30 minutes or more before installing the roof drip side finish moulding.
Minimum hardening time: 30 minutes
Time needed for complete hardening: 24 hours
75552
2.INSTALL ROOF DRIP SIDE FINISH MOULDING
Engage the 2 clips and install the roof drip side finish moulding.
Remove the protective tape.