Home › Audio / Visual / Telematics › NAVIGATION / MULTI INFO DISPLAY › TELEVISION TUNER
RM3650E _56 Audio / Visual / Telematics _079984 NAVIGATION / MULTI INFO DISPLAY _0387992 TELEVISION TUNER A

NAVIGATION / MULTI INFO DISPLAY  TELEVISION TUNER  INSTALLATION  


PROCEDURE

Hide 1.INSTALL DIGITAL TELEVISION TUNER ASSEMBLY

a.
E416377

Position the digital television tuner assembly (2) to the No. 1 digital television bracket set.


b.

Tighten the bolts (1).

Torque:
3.0 N*m (31 kgf*cm, 27 in.*lbf)


Hide 2.INSTALL DIGITAL TELEVISION TUNER ASSEMBLY WITH BRACKET

NOTICE:
·

Damage to wires when disconnecting connectors and plug connections.

Sheared wires can cause a short circuit.

-

Do not pull on the wires when disconnecting connectors and plug connections.



·

Sensitive optical fibers.

Damaged optical fibers can result in operating failure of the LED.

-

Do not bend optical fibers too much and do not kink, as well. The minimum permissible bending radius is 25 mm.

-

Avoid pressure and tensile loads and heat influences on the optical fiber.




a.
E416376

Attach the clamps (2).


b.

Install the digital television tuner assembly with bracket (3) with the nut (1).

Torque:
6.0 N*m (61 kgf*cm, 53 in.*lbf)


c.
E417217

Connect connectors (1) and lock.


Hide 64740B 3.INSTALL DECK TRIM SIDE BOARD AND DECK SIDE TRIM COVER LH

Hide 4. ENCODE/PROGRAM CONTROL UNIT(S)

NOTICE:
·

Use the most recent software version to prevent faults during programming/encoding.

·

The battery voltage must not drop below 13.0 V during programming.

·

Use only recommended chargers for a low-voltage vehicle electrical system.

·

Do not exceed the maximum charging voltage of 14.8 V when charging the battery.

·

When there is communication abnormality in the middle of work, control unit might be damaged.

·

It may be necessary to perform the Action Plan several times.



a.

Connect the battery charger to the vehicle.


b.

Connect the diagnosis system with the vehicle.


c.

Determine the action plan.

Service plan / Programming plan / Action plan / Calculate action plan


d.

Accept and fully process the measures plan.

Service plan / Programming plan / Action plan / Perform action plan


e.

Wait until programming/encoding has been completed.

NOTICE:

When there is communication abnormality in the middle of work, control unit might be damaged.



f.

Carry out vehicle test.

Vehicle management / Troubleshooting / Fault memory / Calculate test plan


g.

Delete the fault memory.

Vehicle management / Troubleshooting / Fault memory / Delete fault memory


h.

Disconnect the diagnosis system from the vehicle.


i.

Disconnect the battery charger from the vehicle.