1.INSTALL BLIND SPOT MONITOR SENSOR LH
|
Install in this Direction |
Attach the claws (1) to install the blind spot monitor sensor (2) in the direction of the arrow.
Attach the clips (2) to connect the wiring harness (3).
Connect connector (1) and lock.
2.INSTALL BLIND SPOT MONITOR SENSOR RH
Use the same procedure as for the LH side.
52616B
3.INSTALL ABSORBER FUNNEL LH
Attach the claws (2) to install the absorber funnel LH (1).
52615C
4.INSTALL ABSORBER FUNNEL RH
Use the same procedure as for the LH side.
5.INSTALL REAR BUMPER ASSEMBLY
6. ENCODE/PROGRAM CONTROL UNIT(S)
Use the most recent software version to prevent faults during programming/encoding.
The battery voltage must not drop below 13.0 V during programming.
Use only recommended chargers for a low-voltage vehicle electrical system.
Do not exceed the maximum charging voltage of 14.8 V when charging the battery.
When there is communication abnormality in the middle of work, control unit might be damaged.
It may be necessary to perform the Action Plan several times.
Connect the battery charger to the vehicle.
Connect the diagnosis system with the vehicle.
Determine the action plan.
Service plan / Programming plan / Action plan / Calculate action plan
Accept and fully process the measures plan.
Service plan / Programming plan / Action plan / Perform action plan
Wait until programming/encoding has been completed.
When there is communication abnormality in the middle of work, control unit might be damaged.
Carry out vehicle test.
Vehicle management / Troubleshooting / Fault memory / Calculate test plan
Delete the fault memory.
Vehicle management / Troubleshooting / Fault memory / Delete fault memory
Disconnect the diagnosis system from the vehicle.
Disconnect the battery charger from the vehicle.