Use the same procedure for LHD and RHD vehicles.
The procedure listed below is for the LHD vehicles.
1.INSTALL USB HUB
Connect connectors (1) and lock to install the No. 5 instrument panel wire (2).
Position the USB hub (1).
Tighten the T30 screws (1).
Connect connectors (1) and lock.
2.INSTALL INSTRUMENT PANEL SAFETY PAD ASSEMBLY
3. ENCODE/PROGRAM CONTROL UNIT(S)
Use the most recent software version to prevent faults during programming/encoding.
The battery voltage must not drop below 13.0 V during programming.
Use only recommended chargers for a low-voltage vehicle electrical system.
Do not exceed the maximum charging voltage of 14.8 V when charging the battery.
When there is communication abnormality in the middle of work, control unit might be damaged.
It may be necessary to perform the Action Plan several times.
Connect the battery charger to the vehicle.
Connect the diagnosis system with the vehicle.
Determine the action plan.
Service plan / Programming plan / Action plan / Calculate action plan
Accept and fully process the measures plan.
Service plan / Programming plan / Action plan / Perform action plan
Wait until programming/encoding has been completed.
When there is communication abnormality in the middle of work, control unit might be damaged.
Carry out vehicle test.
Vehicle management / Troubleshooting / Fault memory / Calculate test plan
Delete the fault memory.
Vehicle management / Troubleshooting / Fault memory / Delete fault memory
Disconnect the diagnosis system from the vehicle.
Disconnect the battery charger from the vehicle.