Home › ENGINE ยท 1GR-FE › STARTING › STARTER (for 4WD)

STARTER (for 4WD) > INSTALLATION

for Preparation Click here



1. INSTALL STARTER ASSEMBLY
  1. Install the starter assembly with the 2 bolts.

    Torque:
    37 N*m{ 377 kgf*cm , 27 ft.*lbf }

  1. Install the wire harness to terminal 30 with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 7 ft.*lbf }

  1. Connect the terminal 50 connector to the starter assembly.



2. INSTALL NO.2 STEERING INTERMEDIATE SHAFT


A076412E01
  1. Install the steering sliding yoke onto steering intermediate shaft No. 2.

  1. Install bolt B and then tighten bolt B and A.

    Torque:
    36 N*m{ 370 kgf*cm , 27 ft.*lbf }



3. INSTALL FRONT FENDER SEAL LH
  1. Install the front fender splash shield rear LH with the 5 clips.



4. INSTALL NO.2 EXHAUST FRONT PIPE ASSEMBLY
(Click here)


5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
3.9 N*m{ 40 kgf*cm , 35 in.*lbf }



6. CHECK FOR EXHAUST GAS LEAKAGE


7. INSTALL NO.1 ENGINE UNDER COVER SUB-ASSEMBLY
  1. Install the engine under cover with the 4 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }