Home › STEERING › POWER STEERING › POWER STEERING LINK (for 2WD)

POWER STEERING LINK (for 2WD) > INSTALLATION

for Preparation Click here



1. INSTALL POWER STEERING LINK


F051692
  1. Install the power steering link with the 2 bolts and 2 nuts.

    Torque:
    92 N*m{ 938 kgf*cm , 68 ft.*lbf }

    NOTICE:
    Never turn the nut since it has a detent. Be sure to turn only the bolt.



2. INSTALL PRESSURE FEED TUBE ASSEMBLY


F051683
  1. Connect the return hose with the clip.



    F051698E02
  1. Using union nut wrench, tighten the flare nut and connect the pressure feed tube.

    Torque:
    for use without union nut wrench:
    24 N*m{ 245 kgf*cm , 18 ft.*lbf }
    for use with union nut wrench:
    22 N*m{ 222 kgf*cm , 16 ft.*lbf }

    HINT:
    1. Use a torque wrench with a fulcrum length of 300 mm (11.81 in.).
    2. This torque value is effective when union nut wrench is parallel to a torque wrench.



    C114974E01
  1. Install the tube support bracket with the bolt.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }



3. INSTALL TIE ROD END SUB-ASSEMBLY LH
  1. Install the tie rod end onto the steering knuckle arm.

  1. Install the nut.

    Torque:
    49 N*m{ 500 kgf*cm , 36 ft.*lbf }

  1. Install a new cotter pin.



4. INSTALL TIE ROD END SUB-ASSEMBLY RH

HINT:
The installation procedure for the RH side is the same as that for the LH side.



5. INSTALL STEERING INTERMEDIATE SHAFT NO. 2


F051678E01
  1. Align the matchmarks on the steering intermediate shaft No. 2 and power steering link.

  1. Install the steering intermediate shaft No. 2 onto the power steering link with bolt C.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }



    F051677E01
  1. Align the matchmarks on the steering intermediate shaft and steering sliding yoke.

  1. Install the steering sliding yoke onto the steering intermediate shaft and slide it upward.

  1. Align the matchmarks on the steering sliding yoke and steering intermediate shaft No. 2.

  1. Install the steering sliding yoke with bolts A and B.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }



6. INSTALL FRONT WHEELS

Torque:
113 N*m{ 1,152 kgf*cm , 83 ft.*lbf }



7. PLACE FRONT WHEELS FACING STRAIGHT AHEAD


8. INSPECT STEERING WHEEL CENTER POINT


9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
5.4 N*m{ 55 kgf*cm , 48 in.*lbf }

(Click here)


10. ADD POWER STEERING FLUID


11. BLEED POWER STEERING FLUID
  1. Check the fluid level.

  1. Jack up the front of the vehicle and support it with stands.

  1. Turn the steering wheel.

    1. With the engine stopped, turn the wheel slowly from lock to lock several times.

  1. Lower the vehicle.

  1. Start the engine.

    1. Run the engine at idle for a few minutes.

  1. Turn the steering wheel.

    1. With the engine idling, turn the wheel to the left or right full lock position and keep it there for 2 to 3 seconds. Then turn the wheel to the opposite full lock position and keep it there for 2 to 3 seconds (step A).

    2. Repeat step A several times.

  1. Stop the engine.



    C114971E01
  1. Check for foaming or emulsification.
    Especially, if the system has to be bled twice because of foaming or emulsification, check for fluid leakage in the system.

  1. Check the fluid level.



12. CHECK FOR POWER STEERING FLUID LEAKAGE


13. INSPECT AND ADJUST FRONT WHEEL ALIGNMENT
(Click here)