AIR SWITCHING VALVE (w/ Secondary Air Injection System) > INSTALLATION |
| 1. INSTALL AIR SWITCHING VALVE ASSEMBLY |
Install the air switching valve assembly with the bolt and 2 nuts.
Install the wire harness bracket with the bolt.
Connect the wire harness clamp.
Connect the 2 air switching valve connectors.
| 2. INSTALL NO. 2 AIR TUBE |
Install the No. 2 air tube.
Temporarily install a new gasket and the No. 2 air tube to the air switching valve side with the 2 nuts. Then temporarily install a new gasket and the No. 2 air tube to the exhaust manifold side with the 2 nuts.
Temporarily install the No. 2 air tube bracket to the rear water by-pass joint with the bolt.
Tighten the bolt and 4 nuts.
| 3. INSTALL NO. 1 AIR TUBE |
Install the No. 1 air tube.
Temporarily install a new gasket and the No. 1 air tube to the exhaust manifold side with the 2 nuts.
Install a new gasket and the No. 1 air tube to the air switching valve side with the 2 bolts.
Tighten the 2 nuts on the exhaust manifold side.
| 4. CONNECT AIR TUBE ASSEMBLY |
Connect the air tube assembly with the clip.
| 5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH NO. 2 AIR CLEANER HOSE |
Install the air cleaner cap sub-assembly with No. 2 air cleaner hose and lock the 2 clamps.
Install the 2 bolts.
| 6. INSTALL V-BANK COVER |
Install the V-bank cover with the 2 nuts.
| 7. INSTALL AIR PUMP ASSEMBLY |
| 8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |