Home › ENGINE ยท 1GR-FE › EMISSION CONTROL › AIR SWITCHING VALVE (w/ Secondary Air Injection System)

AIR SWITCHING VALVE (w/ Secondary Air Injection System) > REMOVAL

for Preparation Click here



1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL


2. REMOVE AIR PUMP ASSEMBLY
(Click here)


3. REMOVE V-BANK COVER


A075593E01
  1. Remove the 2 nuts, then remove the V-bank cover.



4. REMOVE AIR CLEANER CAP SUB-ASSEMBLY WITH NO. 2 AIR CLEANER HOSE


A261610
  1. Remove the 2 bolts.

  1. Unlock the 2 clamps and remove the air cleaner cap sub-assembly with No. 2 air cleaner hose.



5. DISCONNECT AIR TUBE ASSEMBLY


A261611
  1. Loosen the clip and disconnect the air tube assembly.



6. REMOVE NO. 1 AIR TUBE
  1. Remove the 2 bolts, 2 nuts, No. 1 air tube and 2 gaskets.

    NOTICE:
    Be careful not to damage the installation surface of the gaskets.



7. REMOVE NO. 2 AIR TUBE
  1. Remove the bolts and 4 nuts, then disconnect the No. 2 air tube.



  1. Remove the 2 gaskets.

    NOTICE:
    Be careful not to damage the installation surface of the gaskets.



    A261615E01


    Text in Illustration 
    *1
    No. 2 Air Tube
    *2
    No. 1 Air Tube



8. REMOVE AIR SWITCHING VALVE ASSEMBLY


    A261612
  1. Disconnect the 2 air switching valve connectors.

  1. Disconnect the wire harness clamp.



    A261613
  1. Remove the bolt and the wire harness bracket.



    A261616
  1. Remove the 2 nuts, bolt and air switching valve assembly.