FUEL INJECTOR > INSTALLATION |
| 1. INSTALL FUEL INJECTOR |
![]() |
Install a new insulator onto each fuel injector.
Apply a light coat of spindle oil or gasoline to each new O-ring and install one onto each fuel injector.
![]() |
Install the 6 injectors.
While turning each fuel injector left and right, install it onto the fuel delivery pipe.
Position the fuel injector connectors facing outward.
| 2. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY |
![]() |
Place the fuel delivery pipe together with the 6 fuel injectors on the intake manifold.
Temporarily install the 6 bolts, which are used to hold the fuel delivery pipe, onto the intake manifold.
Check that the fuel injectors rotate smoothly.
Position the fuel injector connectors facing outward.
Tighten the 6 bolts, which are used to hold the fuel delivery pipe, to the intake manifold.
Connect the 6 fuel injector connectors.
| 3. CONNECT NO. 2 FUEL PIPE SUB-ASSEMBLY |
![]() |
Push the tube connector into the pipe until the tube connector makes a "click" sound.
Install the fuel pipe clamp.
| 4. CONNECT NO. 1 FUEL PIPE SUB-ASSEMBLY |
![]() |
Push the tube connector into the pipe until the tube connector makes a "click" sound.
Install the fuel pipe clamp.
| 5. INSTALL INTAKE AIR SURGE TANK |
Install a new gasket to the intake air surge tank.
![]() |
Using an 8 mm hexagon wrench, install the intake air surge tank with the 4 bolts and 2 nuts.
![]() |
Install the No. 2 surge tank stay with the 2 bolts.
Install the No. 1 surge tank stay with the 2 bolts.
![]() |
Install the oil baffle plate with the bolt.
Attach the wire harness clamp.
![]() |
Install the throttle body bracket with the 2 bolts.
![]() |
Connect the vacuum switching valve (for ACIS) connector.
Attach the 2 wire harness clamps.
![]() |
Connect the No. 1 ventilation hose.
![]() |
Connect the union to check valve hose.
Connect the purge VSV connector.
Connect the purge line hose.
![]() |
Connect the No. 4 water by-pass hose.
Connect the No. 5 water by-pass hose.
Connect the throttle position sensor and throttle control motor connector.
| 6. INSTALL AIR CLEANER ASSEMBLY WITH ELEMENT |
![]() |
Install the air cleaner with element with the 2 bolts.
Tighten the hose clamp.
![]() |
Connect the MAF meter connector.
Attach the 2 wire harness clamps.
Connect the vacuum hose.
![]() |
Attach the hose clamp.
Connect the No. 2 ventilation hose.
| 7. INSTALL NO. 2 AIR CLEANER HOSE |
![]() |
![]() |
Install the air cleaner hose with the 2 bolts.
Tighten the hose clamp.
| 8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 9. ADD ENGINE COOLANT |
Add engine coolant.
![]() |
Slowly pour coolant into the radiator reservoir until it reaches the FULL line.
Install the reservoir cap.
Press the inlet and outlet radiator hoses several times by hand, and then check the coolant level. If the coolant level is low, add coolant.
Install the radiator cap.
Start the engine and warm it up until the thermostat opens.
Maintain the engine speed at 2000 to 2500 rpm.
Press the inlet and outlet radiator hoses several times by hand to bleed air.
Stop the engine, and wait until the engine coolant cools down to ambient temperature.
![]() |
Check that the coolant level is between the FULL and LOW lines.
If the coolant level is below the LOW line, repeat all of the procedures above.
If the coolant level is above the FULL line, drain coolant so that the coolant level is between the FULL and LOW lines.
| 10. CHECK FOR FUEL LEAK |
Connect the Techstream to the DLC3.
Turn the ignition switch to ON and Techstream main switch ON.
Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump / Speed.
Check that there are no fuel leaks after doing maintenance anywhere on the fuel system.
| 11. CHECK FOR ENGINE COOLANT LEAK |
![]() |
Fill the radiator with coolant and attach a radiator cap tester.
Warm up the engine.
Using the radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf/cm2, 17 psi), and check that the pressure does not drop.
If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and head.
| 12. INSTALL V-BANK COVER |
![]() |
Install the V-bank cover with the 2 nuts.
| 13. INSTALL FRONT COWL TOP OUTER PANEL SUB-ASSEMBLY |
Install the front cowl top outer panel with the 7 bolts.

Connect the 2 washer hoses.
| 14. INSTALL FRONT WIPER MOTOR AND LINK ASSEMBLY |
Install the front wiper motor and link (Click here).
| 15. INSTALL NO. 1 ENGINE UNDER COVER |
Install the engine under cover with the 5 bolts and 3 screws.