Home › ENGINE ยท 1GR-FE › FUEL › FUEL PRESSURE PULSATION DAMPER

FUEL PRESSURE PULSATION DAMPER > INSTALLATION

for Preparation Click here



1. INSTALL FUEL PRESSURE PULSATION DAMPER ASSEMBLY


    A157496E01
  1. Apply a light coat of spindle oil or gasoline to a new O-ring and install it onto the fuel pressure pulsation damper.

  1. Install the fuel pressure pulsation damper onto the fuel delivery pipe.

  1. Install the clip.



2. INSTALL INTAKE AIR SURGE TANK
  1. Install a new gasket to the intake air surge tank.



    A075648E05
  1. Using an 8 mm hexagon wrench, install the intake air surge tank with the 4 bolts and 2 nuts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }



    A151772
  1. Install the No. 2 surge tank stay with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Install the No. 1 surge tank stay with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



    A151773
  1. Install the oil baffle plate with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Attach the wire harness clamp.



    A151767
  1. Install the throttle body bracket with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



    A151768
  1. Connect the vacuum switching valve (for ACIS) connector.

  1. Attach the 2 wire harness clamps.



    A151766
  1. Connect the No. 1 ventilation hose.



    A151765
  1. Connect the union to check valve hose.

  1. Connect the purge VSV connector.

  1. Connect the purge line hose.

    HINT:
    Install the hose so that the direction of the hose clamp is as indicated in the illustration.



    A151857E01
  1. Connect the No. 4 water by-pass hose.

  1. Connect the No. 5 water by-pass hose.

  1. Connect the throttle position sensor and throttle control motor connector.



3. INSTALL AIR CLEANER ASSEMBLY WITH ELEMENT


    A151811E01
  1. Install the air cleaner with element with the 2 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Tighten the hose clamp.

    HINT:
    Tighten the hose clamp until it reaches the specified protrusion height labeled A shown in the illustration.

    Standard protrusion height:
    Below 0.5 mm (0.0197 in.)



    A151769
  1. Connect the MAF meter connector.

  1. Attach the 2 wire harness clamps.

  1. Connect the vacuum hose.



    A151812
  1. Attach the hose clamp.

  1. Connect the No. 2 ventilation hose.



4. INSTALL NO. 2 AIR CLEANER HOSE


A161774E01

HINT:
Securely insert the pin of the No. 2 air cleaner hose into the grommet.



    A151855E01
  1. Install the air cleaner hose with the 2 bolts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

  1. Tighten the hose clamp.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

    HINT:
    Tighten the clamp until the end of the clamp band is within both limit marks.



5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
Some systems need to be initialized after the cable is reconnected (Click here).



6. ADD ENGINE COOLANT
  1. Add engine coolant.

    Standard capacity:
    9.6 liters (10.1 US qts, 8.4 Imp. qts)

    HINT:
    1. TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology is a combination of low phosphates and organic acids).
    2. The thermostat opening timing can be confirmed by pressing the inlet radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.



    A151850E01
  1. Slowly pour coolant into the radiator reservoir until it reaches the FULL line.

  1. Install the reservoir cap.

  1. Press the inlet and outlet radiator hoses several times by hand, and then check the coolant level. If the coolant level is low, add coolant.

  1. Install the radiator cap.

  1. Start the engine and warm it up until the thermostat opens.

    HINT:
    The thermostat opening timing can be confirmed by pressing the inlet radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.

  1. Maintain the engine speed at 2000 to 2500 rpm.

    NOTICE:
    1. Make sure that the radiator reservoir still has some coolant in it.
    2. Pay attention to the needle of the water temperature meter. Make sure that the needle does not show an abnormally high temperature.
    3. If there is not enough coolant, the engine may burn out or overheat.
    4. Immediately after starting the engine, if the radiator reservoir does not have any coolant, perform the following: 1) stop the engine, 2) wait until the coolant has cooled down, and 3) add coolant until the coolant is filled to the FULL line.
    5. Run the engine at 2000 rpm until the coolant level has stabilized.

  1. Press the inlet and outlet radiator hoses several times by hand to bleed air.

    CAUTION:
    1. Wear protective gloves.
    2. Be careful as the radiator hoses are hot.
    3. Keep your hands away from the fan.

  1. Stop the engine, and wait until the engine coolant cools down to ambient temperature.

    CAUTION:
    Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.



    A161780E03
  1. Check that the coolant level is between the FULL and LOW lines.
    If the coolant level is below the LOW line, repeat all of the procedures above.
    If the coolant level is above the FULL line, drain coolant so that the coolant level is between the FULL and LOW lines.



7. CHECK FOR FUEL LEAK
  1. Connect the Techstream to the DLC3.

  1. Turn the ignition switch to ON and Techstream main switch ON.

    NOTICE:
    Do not start the engine.

  1. Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump / Speed.

  1. Check that there are no fuel leaks after doing maintenance anywhere on the fuel system.



8. INSTALL V-BANK COVER


    A112983E02
  1. Install the V-bank cover with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



9. INSTALL FRONT COWL TOP OUTER PANEL SUB-ASSEMBLY


  1. Install the front cowl top outer panel with the 7 bolts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



    A151796

  1. Connect the 2 washer hoses.



10. INSTALL FRONT WIPER MOTOR AND LINK ASSEMBLY
  1. Install the front wiper motor and link assembly (Click here).



11. INSTALL NO. 1 ENGINE UNDER COVER
  1. Install the engine under cover with the 5 bolts and 3 screws.

    Torque:
    for bolt:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }
    for screw:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }