Home › TRANSMISSION ยท A750E AUTOMATIC TRANSMISSION › OIL COOLER (w/ Trailer Towing System)

OIL COOLER (w/ Trailer Towing System) > INSTALLATION

for Preparation Click here



1. INSTALL OIL COOLER ASSEMBLY


C155881
  1. Install the No. 1 and No. 2 oil cooler air ducts with the 4 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Install the and oil cooler support with the 2 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }



    C155880E01
  1. Temporarily place the oil cooler on the radiator support.

    NOTICE:
    Securely attach the claw of the oil cooler into the hole of the radiator support.

  1. Install the 3 bolts.

  1. Install the oil cooler with the 3 bolts.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }



2. INSTALL OIL COOLER TUBE


C157296
  1. Install the oil cooler tube with the 2 bolts.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }



3. CONNECT TRANSMISSION OIL COOLER HOSE


C157295E01
  1. Connect the No. 1 oil cooler inlet hose and No. 1 oil cooler outlet hose shown in the illustration.

    NOTICE:
    Make sure the pinching portion of each clip is facing the direction shown in the illustration.

  1. Pass the 2 hoses through the flexible hose clamp and close the clamp shown in the illustration.



    C155877
  1. Connect the No. 2 transmission oil cooler inlet hose and No. 2 transmission oil cooler outlet hose.

    NOTICE:
    Make sure the pinching portion of each clip is facing the direction shown in the illustration.



4. ADD AUTOMATIC TRANSMISSION FLUID
  1. Add automatic transmission fluid (Click here).



5. INSTALL FRONT BUMPER ASSEMBLY
  1. for Steel Type Bumper:
    Install the front bumper (Click here).

  1. for Resin Type Bumper:
    Install the front bumper (Click here).