OIL COOLER (w/ Trailer Towing System) > INSTALLATION |
| 1. INSTALL OIL COOLER ASSEMBLY |
![]() |
Install the No. 1 and No. 2 oil cooler air ducts with the 4 bolts.
Install the oil cooler support with the 2 bolts.
![]() |
Temporarily put the oil cooler on the radiator support.
Install the 3 bolts.
| 2. INSTALL OIL COOLER TUBE |
![]() |
Install the oil cooler tube with the 2 bolts.
| 3. CONNECT TRANSMISSION OIL COOLER HOSE |
![]() |
Connect the inlet No. 1 oil cooler hose and outlet No. 1 oil cooler hose as shown in the illustration.
Pass the 2 hoses through the flexible hose clamp and close the clamp as shown in the illustration.
![]() |
Connect the inlet No. 2 transmission oil cooler hose and outlet No. 2 transmission oil cooler hose.
Install the bolt to fix the water by-pass pipe in place.
| 4. ADD AUTOMATIC TRANSMISSION FLUID |
Add automatic transmission fluid (Click here).
| 5. INSTALL FRONT BUMPER ASSEMBLY |
for Steel Type:
Install the front bumper (Click here).
for Resin Type:
Install the front bumper (Click here).