Home › ENGINE ยท 3UR-FE › CHARGING › GENERATOR

GENERATOR > INSTALLATION

for Preparation Click here



1. INSTALL GENERATOR ASSEMBLY


    A156406
  1. Install the generator with the 3 bolts and nut.

    Torque:
    43 N*m{ 439 kgf*cm , 32 ft.*lbf }



    A156405
  1. Connect the generator connector.

  1. Connect the generator wire with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Install the terminal cap.

  1. Install the harness bracket to the generator with the bolt.

    Torque:
    31 N*m{ 316 kgf*cm , 23 ft.*lbf }



2. CONNECT VANE PUMP ASSEMBLY


A163333E01

HINT:
Before performing the following procedures, move the spacer until the vane pump can be installed.



    A163289
  1. Connect the vane pump to the timing chain cover with the 2 bolts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }



    A164433
  1. Connect the 2 clamps and power steering oil pressure switch connector.



3. INSTALL FRONT FENDER APRON SEAL RH
  1. Install the apron seal with the 5 clips.



4. INSTALL FAN AND GENERATOR V BELT


    A053117E03
  1. Set the V belt onto every part except the No. 2 idler pulley, as shown in the illustration.

  1. Loosen the V belt by turning the belt tensioner counterclockwise.

  1. Set the V belt to the No. 2 idler pulley.



    A141644E02
  1. After installing the belt, check that it fits properly in the ribbed grooves.

  1. Check by hand to confirm that the belt has not slipped out of the grooves on the bottom of the pulley.



    A141645E01
  1. Check that the arrow on the belt tensioner is within area "A".
    If it is outside area "A", replace the fan and generator V belt.

    HINT:
    When a new belt is installed, the arrow should be within area "B". If not, the fan and generator V belt is not installed correctly.



5. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY


    A150108
  1. Hook the engine under cover to the vehicle body as shown in the illustration.

  1. Install the 3 screws and 5 bolts.

    Torque:
    for bolt:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }
    for screw:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }



6. INSTALL AIR CLEANER ASSEMBLY


    A156197E01
  1. Install the air cleaner case with the 2 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Install the air cleaner element onto the air cleaner case.



    A162105E01
  1. Install the air cleaner cap.

    1. Fasten the 4 hook clamps.

    2. Connect the MAF meter connector.

    3. Attach the wire harness clamp.



7. INSTALL AIR CLEANER HOSE ASSEMBLY


    A162102
  1. Install the air cleaner hose with the 2 clamps.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

  1. Connect the vacuum hose.

  1. Connect the ventilation hose.



8. INSTALL V-BANK COVER


    A165576E02
  1. Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins, and press down on the V-bank cover to attach the pins.



9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
Some systems need to be initialized after the cable is reconnected (Click here).