Home › STEERING › POWER STEERING › VANE PUMP (for 2UZ-FE)

VANE PUMP (for 2UZ-FE) > INSTALLATION

for Preparation Click here



1. INSTALL VANE PUMP ASSEMBLY
  1. Install the 2 bolts and nut.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }



2. CONNECT PRESSURE FEED TUBE


    C158818
  1. Connect the pressure feed tube.

  1. Install a new gasket and the union bolt on the pressure feed tube.

    Torque:
    51 N*m{ 520 kgf*cm , 38 ft.*lbf }



3. CONNECT POWER STEERING OIL PRESSURE SENSOR CONNECTOR


C158740


4. CONNECT RETURN HOSE


C158816
  1. Connect the return hose with the clip.



5. CONNECT VACUUM HOSES
  1. Connect the vacuum hoses with the clips.



6. CONNECT NO. 2 VENTILATION HOSE
  1. Connect the No. 2 ventilation hose to the air cleaner.



7. INSTALL FAN AND GENERATOR V BELT


    A053117E03
  1. Set the V belt onto every part except the No. 2 idler pulley, as shown in the illustration.

  1. Loosen the V belt by turning the belt tensioner counterclockwise.

  1. Set the V belt to the No. 2 idler pulley.



    A141644E02
  1. After installing the belt, check that it fits properly in the ribbed grooves.

  1. Check by hand to confirm that the belt has not slipped out of the grooves on the bottom of the pulley.



    A141645E01
  1. Check that the arrow on the belt tensioner is within area "A".
    If it is outside area "A", replace the fan and generator V belt.

    HINT:
    When a new belt is installed, the arrow should be within area "B". If not, the fan and generator V belt is not installed correctly.



8. INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE
  1. Install the air cleaner with air cleaner hose with the 2 bolts.

    Torque:
    5.0 N*m{ 50 kgf*cm , 44 in.*lbf }

  1. Install the clamp.

  1. Connect the hoses.

  1. Connect the MAF meter connector.



9. INSTALL THROTTLE BODY COVER SUB-ASSEMBLY


    A156184E02
  1. Install the 2 throttle body cover brackets with the 2 bolts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



    A156183E01
  1. Install the throttle body cover with the 2 cap nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



10. INSTALL NO. 1 ENGINE UNDER COVER


    A150108
  1. Hook the engine under cover onto the vehicle body as shown in the illustration.

  1. Install the 3 screws and 5 bolts.

    Torque:
    for bolt:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }
    for screw:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }



11. ADD POWER STEERING FLUID


12. BLEED POWER STEERING FLUID
  1. Check the fluid level.

  1. Jack up the front of the vehicle and support it with stands.

  1. Turn the steering wheel.

    1. With the engine stopped, turn the wheel slowly from lock to lock several times.

  1. Lower the vehicle.

  1. Start the engine.

  1. Run the engine at idle for a few minutes.

  1. Turn the steering wheel.

    1. With the engine idling, turn the wheel left or right to the full lock position and keep it there for 2 to 3 seconds, then turn the wheel to the opposite full lock position and keep it there for 2 to 3 seconds.(*1)

    2. Repeat (*1) several times.

  1. Stop the engine.



    C124274E02
  1. Check for foaming or emulsification.
    If the system has to be bled twice because of foaming or emulsification, check for fluid leaks in the system.

  1. Check the fluid level.



13. INSPECT FOR POWER STEERING FLUID LEAK


14. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
Some systems need to be initialized after the cable is reconnected (Click here).