CANISTER > INSTALLATION |
| 1. INSTALL CANISTER ASSEMBLY |
![]() |
Install the canister with the 4 bolts.
![]() |
Connect the wire harness clamp.
![]() |
Connect the vent line hose.
Push the hose into the port and push the retainer to lock it.
Connect the air inlet line hose.
Connect the purge line hose.
Connect the pump module connector.
![]() |
Connect the wiring harness clamp bracket with the nut.
| 2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |