Home › ENGINE ยท 2UZ-FE › EMISSION CONTROL › CANISTER

CANISTER > INSTALLATION

for Preparation Click here



1. INSTALL CANISTER ASSEMBLY


    A147035
  1. Install the canister with the 4 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }



    A147033
  1. Install the wire harness clamp.



    A156068E01
  1. Connect the vent line hose.

    1. Push the hose into the port and push the retainer to lock it.

      NOTICE:
      1. Check for damage or foreign objects on the connected part.
      2. After connecting, check that the vent hose and the valve are securely connected by pulling on them.

  1. Connect the air inlet line hose.

    NOTICE:
    1. Check for damage or foreign objects on the connected part.
    2. After connecting, check that the vent hose and the valve are securely connected by pulling on them.

  1. Connect the purge line hose.

  1. Connect the pump module connector.



    A147034
  1. Connect the wiring harness clamp bracket with the nut.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
Some systems need to be initialized after the cable is reconnected (Click here).