Home › ENGINE ยท 2UZ-FE › ENGINE MECHANICAL › CYLINDER HEAD GASKET (for Bank 1)

CYLINDER HEAD GASKET (for Bank 1) > INSTALLATION

for Preparation Click here



1. INSPECT CYLINDER HEAD SET BOLT


    A142747E02
  1. Using a vernier caliper, measure the thread outside diameter of the bolt.

    Measuring point:
    Item
    Specified Condition
    Intake side
    82 mm (3.23 in.)
    Exhaust side
    86 mm (3.39 in.)

    Standard outside diameter:
    9.810 to 9.960 mm (0.386 to 0.392 in.)

    Minimum outside diameter:
    9.700 mm (0.382 in.)

    If the outside diameter is less than the minimum, replace the set bolt.

    HINT:
    If a visual check reveals no excessively thin areas, check the center of the bolt (see illustration) and find the area that has the lowest diameter.



2. INSPECT CYLINDER HEAD


    A107611E04
  1. Using a precision straightedge and feeler gauge, measure the surfaces contacting the cylinder block and manifolds for warpage.

    Maximum warpage:
    Item
    Specified Condition
    Cylinder block side
    0.10 mm (0.00394 in.)
    Intake manifold side
    0.10 mm (0.00394 in.)
    Exhaust manifold side
    0.10 mm (0.00394 in.)

    1. If the warpage is greater than the maximum, replace the cylinder head.



    A053866E01
  1. Using a dye penetrant, check the combustion chamber, intake ports, exhaust ports and cylinder block surface for cracks.
    If the cylinder head is cracked, replace it.



3. INSTALL CYLINDER HEAD GASKET LH


    A160768
  1. Clean the cylinder block and cylinder head with solvent.

  1. Place a new cylinder head gasket in position on the cylinder block.

    HINT:
    A mark is placed on the rear side of the cylinder head gasket to distinguish the LH and RH sides, a "2R" mark for the RH side and a "2L" mark for the LH side.

    NOTICE:
    Be careful of the installation direction.



4. INSTALL CYLINDER HEAD LH


    G039657E01
  1. Check that the timing mark of the crankshaft timing pulley is in the position shown in the illustration, and that the piston is below the TDC of compression.

  1. Install the cylinder head with the exhaust manifold to the cylinder block.

    NOTICE:
    Ensure that no oil is on the mounting surface of the cylinder head.

  1. Apply a light coat of engine oil to the threads and under the heads of the cylinder head bolts.



  1. Step 1:

    1. Set the plate washer to the cylinder head bolt.



    2. A115101E04
    3. Install and uniformly tighten the 10 cylinder head bolts and plate washers in the sequence shown in the illustration.

      Torque:
      32 N*m{ 326 kgf*cm , 24 ft.*lbf }

      If any one of the cylinder head bolts does not meet the torque specification, replace the cylinder head bolt.

      HINT:
      The cylinder head bolts are tightened in 3 progressive steps.

      NOTICE:
      Do not drop the plate washer for the cylinder head bolt into portion A of the cylinder head. If dropped into portion A, the plate washer will pass through the cylinder head and cylinder block into the oil pan.



  1. Step 2:



      A115112E02
    1. Mark the cylinder head bolt head with paint as shown in the illustration.

    2. Tighten the cylinder head bolts another 90° in the sequence shown in step 1.

  1. Step 3:

    1. Tighten the cylinder head bolts another 90° in the sequence shown in step 1.

    2. Check that the painted marks are now facing rearward.



5. INSTALL VALVE LIFTER
  1. Apply a light coat of engine oil to the valve lifters and shims.

  1. Install the valve lifters and shims to the cylinder head.

  1. Check that the valve lifter rotates smoothly by hand.



6. INSTALL CAMSHAFT SETTING OIL SEAL


    A118107E01
  1. Insert 2 new oil seals into the camshaft timing tube until they reach the stopper.

    NOTICE:
    1. Be careful of the installation direction.
    2. Do not turn over the lip of the oil seal.



7. INSTALL CAMSHAFT TIMING TUBE ASSEMBLY


    A054965E05
  1. Align the timing tube knock pin with the knock pin groove of the drive gear, and temporarily install the drive gear with the 4 bolts.

  1. Using SST and a 5 mm hexagon wrench, uniformly tighten the 4 bolts in several steps.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

    SST
    09960-10010   (09963-00500)

    NOTICE:
    Be careful not to damage the timing tube.



    A054967E01
  1. Mount the hexagonal portion of the camshaft in a vise.

    NOTICE:
    Be careful not to damage the camshaft.



    A118091E01
  1. Align the camshaft knock pin with the knock pin groove of the timing tube, and push the timing tube by hand until it touches the bottom.

  1. Using a 10 mm hexagon wrench, install the bolt.

    Torque:
    78 N*m{ 795 kgf*cm , 58 ft.*lbf }

  1. Install the seal washer and screw plug.

    Torque:
    15 N*m{ 153 kgf*cm , 11 ft.*lbf }



8. INSTALL CAMSHAFT SUB-ASSEMBLY LH

NOTICE:
  1. As the thrust clearance of the camshaft is small, the camshaft must be kept level while it is being removed. If the camshaft is not kept level, the portion of the cylinder head which receives the shaft thrust may crack or be damaged. To avoid this, the following steps should be carried out.

  2. A134393E04
    Having the crankshaft pulley at a wrong angle can cause the piston head and valve head to come into contact with each other when removing the camshaft. Always set the crankshaft pulley at the correct angle as shown in the illustration.

  1. Apply a light coat of engine oil to the cam lobe and gear of the camshaft and also the journal of the cylinder head.



    A118105
  1. Using a wrench, align the timing marks (2 dot marks each) of the camshaft drive and driven main gears, and set the No. 3 and No. 4 camshafts in place.



  1. Install the bearing cap.



      A054975E01
    1. Apply seal packing to the camshaft housing plug groove.

      HINT:
      Remove any old packing (FIPG) material before applying new seal packing.

      Seal packing:
      Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent



    2. A118095
    3. Install the camshaft housing plug and oil control valve filter to the cylinder head as shown in the illustration.

      NOTICE:
      1. Be careful of the installation direction.
      2. Remove any oil from the contact surface.



    4. A054357E03
    5. Apply seal packing to the No. 1 bearing cap as shown in the illustration.

      Seal packing:
      Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

      Standard seal diameter:
      1.5 to 2.0 mm (0.0591 to 0.0787 in.)

      NOTICE:
      1. Do not apply seal packing to the front bearing cap grooves.
      2. Install the No. 1 bearing cap and housing plug within 3 minutes.



    6. A118099E05
    7. Install 4 new seal washers to the bearing cap bolts (A and B).

    8. Apply a light coat of engine oil to the threads and under the heads of the bearing cap bolts (C to E).

      NOTICE:
      Do not apply engine oil to the bearing cap bolts (A and B).



    9. A118096
    10. Temporarily install the oil feed pipe and bearing caps with the 22 bolts, as shown in the illustration.

      Bolt length:
      Item
      Length
      Bolt A with seal washer
      94 mm (3.70 in.)
      Bolt B with seal washer
      72 mm (2.84 in.)
      Bolt C
      25 mm (0.984 in.)
      Bolt D
      55 mm (2.17 in.)
      Bolt E
      40 mm (1.58 in.)



    11. A118097E01
    12. Push in the camshaft setting oil seal.



    13. A118099E04
    14. Uniformly tighten the 22 bearing cap bolts in several steps, in the sequence shown in the illustration.

      Torque:
      for bolt 21, 22:
      7.5 N*m{ 76 kgf*cm , 66 in.*lbf }
      for other bolt:
      16 N*m{ 163 kgf*cm , 12 ft.*lbf }



    A118100E01
  1. Bring the service bolt installed in the driven sub-gear upward by turning the hexagonal portion of the camshaft with a wrench.

  1. Remove the service bolt.



9. INSTALL REAR NO. 1 TIMING BELT PLATE LH
  1. Install the No. 1 timing belt plate and No. 2 timing plate with the 2 bolts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



10. INSTALL CAMSHAFT TIMING PULLEY LH


    A160789
  1. Align the camshaft timing tube knock pin with the knock pin groove of the timing pulley.

  1. Temporarily install the 4 bolts of the camshaft timing pulley.

  1. Hold the hexagonal portion of the camshaft with a wrench.

  1. Using a 5 mm hexagon wrench, tighten the 4 bolts.

    Torque:
    8.1 N*m{ 83 kgf*cm , 72 in.*lbf }



11. INSTALL CAMSHAFT POSITION SENSOR ASSEMBLY


    A134807
  1. Install the camshaft position sensor with the bolt and stud bolt.

    Torque:
    7.5 N*m{ 80 kgf*cm , 66 in.*lbf }



12. INSTALL TIMING BELT


    A160802E01
  1. Set the No. 1 cylinder to TDC/compression.

    1. Turn the hexagonal portion of the camshaft to align the timing marks of the camshaft timing pulleys and timing belt plates.

      HINT:
      By turning the camshaft timing pulleys clockwise as follows, installation of the timing pulleys will be easy:
      1/2 tooth turn for the left bank camshaft timing pulley
      1 tooth turn for the right bank camshaft timing pulley



    2. A160751E01
    3. Using the pulley set bolt, turn the crankshaft to align the timing marks of the crankshaft timing pulley and oil pump body.



    A160752
  1. Install the timing belt.

    1. Remove any oil or water from each pulley, and keep them clean.

      NOTICE:
      Only wipe the pulleys. Do not use any cleansing agent on the pulleys.

    2. Face the front mark (arrow) on the timing belt forward.

    3. Set the timing belt on the crankshaft timing pulley.

      HINT:
      Align the installation mark on the timing belt with the timing mark of the crankshaft timing pulley.

    4. Set the timing belt on the No. 2 timing belt idler.

    5. Set the timing belt on the camshaft timing pulley (for bank 1).

      HINT:
      Align the installation mark on the timing belt with the timing mark of the camshaft timing pulley.

    6. Set the timing belt on the water pump pulley.

    7. Set the timing belt on the camshaft timing pulley (for bank 2).

      HINT:
      Align the installation mark on the timing belt with the timing mark of the camshaft timing pulley.

    8. Set the timing belt on the No. 1 timing belt idler.



    A054983E03
  1. Install the belt tensioner.

    1. Using a press, slowly press in the push rod using 981 to 9807 N (100 to 1000 kgf, 220.5 to 2204.7 lbf) of force.

    2. Align the holes of the push rod and housing, and pass a 1.5 mm hexagon wrench through the holes to keep the setting position of the push rod.

    3. Release the press.

    4. Install the dust boot to the belt tensioner.



    5. A160753E01
    6. Temporarily install the belt tensioner with the 2 bolts.

    7. Tighten the 2 bolts.

      Torque:
      26 N*m{ 265 kgf*cm , 19 ft.*lbf }

    8. Using pliers, remove the 1.5 mm hexagon wrench from the timing belt tensioner.



13. CHECK NO. 1 CYLINDER TO TDC / COMPRESSION


    A160757E01
  1. Using the pulley set bolt, slowly turn the crankshaft pulley 2 revolutions from the TDC to TDC.

    NOTICE:
    Always turn the crankshaft pulley clockwise.

  1. Check that each pulley is aligned with each timing mark as shown in the illustration.
    If the timing marks are not aligned, remove the timing belt and reinstall it.

  1. Remove the pulley set bolt.



14. INSPECT VALVE CLEARANCE
  1. Inspect the valve clearance .
    If the result is not as specified, adjust the valve clearance .



15. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH


    EM07143E01
  1. Apply seal packing to the semicircular plug grooves.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

  1. Install the 2 semicircular plugs to the cylinder heads.

  1. Install the gasket to the cylinder head cover.



    A053978E02
  1. Apply seal packing to the cylinder head as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the cylinder head cover within 3 minutes after applying seal packing.



    A160762
  1. Install the cylinder head cover with the 9 bolts. Uniformly tighten the bolts in several steps.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



16. INSTALL SPARK PLUG


17. INSTALL IGNITION COIL ASSEMBLY


    A191542
  1. Install the 8 ignition coils with the 8 bolts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

  1. Connect the 8 ignition coil connectors.



18. INSTALL REAR WATER BY-PASS JOINT


    A160761
  1. Install 2 new gaskets and the water by-pass joint with the 4 nuts and connect the air hose.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }


    HINT:
    A070482E02
    With the flat-bottom of each new gasket facing downward as shown in the illustration, install the 2 gaskets to the engine rear side.



19. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY


    A160760E02
  1. Apply soapy water to a new O-ring and install it to the water by-pass pipe.

  1. Push in the water by-pass pipe end into the pipe hole of the water pump.

  1. Install the water by-pass pipe with the bolt.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }



20. INSTALL FRONT WATER BY-PASS JOINT


    A115096
  1. Install 2 new gaskets and the water by-pass joint with the 4 nuts.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }


    HINT:
    A070482E02
    With the flat-bottom of each new gasket facing downward as shown in the illustration, install the 2 gaskets to the engine front side.



21. INSTALL WATER INLET HOUSING


    A122971E02
  1. Apply seal packing in a continuous line to the places shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1215B or equivalent

    Standard seal diameter:
    2.0 to 3.0 mm (0.0787 to 0.118 in.)

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the water pump within 3 minutes after applying seal packing.

  1. Apply soapy water to a new O-ring and install it to the water inlet housing.



    A122972E01
  1. Temporarily install the water inlet housing with the 2 bolts. Uniformly tighten the bolts in several steps.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

    Bolt length:
    Item
    Length
    Bolt A
    77 mm (3.03 in.)
    Bolt B
    22 mm (0.866 in.)

  1. Connect the water by-pass hose to the water inlet housing.



22. INSTALL INTAKE MANIFOLD


    A156181
  1. Place 2 new gaskets on the intake manifold.

  1. Place the intake manifold on the cylinder heads.



    A156172
  1. Install and uniformly tighten the 6 bolts and 4 nuts in several steps.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }



    A156173
  1. Install the engine wire protector with the 2 bolts.

    Torque:
    8.2 N*m{ 83 kgf*cm , 72 in.*lbf }

  1. Connect the 8 injector connectors.



    A163553
  1. Connect the 2 wire clamps to the wire clamp brackets on the RH delivery pipe.



    A163715
  1. Connect the VSV connector (for ACIS).



    A156174E02
  1. Install the wire bracket to the intake manifold with the bolt.

    Torque:
    8.2 N*m{ 83 kgf*cm , 72 in.*lbf }


    1. Connect the engine wire to the wire bracket and engine hanger.



    A156171
  1. Connect the purge line hose to the purge VSV.

  1. Connect the purge VSV connector.



    A191540E01
  1. Connect the No. 1 ventilation hose to the ventilation valve on the LH cylinder head.



    A156170
  1. Connect the 2 water by-pass hoses to the throttle body.

  1. Connect the throttle position sensor and control motor connector.



23. INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 1)


A191536E01
  1. Install the air switching valve with the 3 nuts.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }

    NOTICE:
    Do not hold the bracket of the air switching valve.



24. INSTALL NO. 3 AIR TUBE


A153518
  1. Temporarily install a new gasket and the No. 3 air tube to the exhaust manifold side with the 2 nuts.

  1. Install a new gasket and the No. 3 air tube to the air switching valve side with the 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Tighten the 2 nuts on the exhaust manifold side.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



25. INSTALL NO. 2 AIR HOSE


    A153516
  1. Install the No. 2 air hose.



    A191535
  1. Connect the air pump connector.

  1. Connect the fuel hose clamp.



26. INSTALL FRONT FENDER APRON SEAL LH


    A159336
  1. Install the fender apron seal with the 5 clips.



27. CONNECT FUEL MAIN TUBE


    A160925
  1. Connect the fuel main tube (Click here).

  1. Install the fuel pipe clamp.



28. CONNECT FUEL RETURN TUBE


    A160926
  1. Connect the fuel return tube (Click here).



29. INSTALL NO. 2 WATER BY-PASS PIPE


    A191539
  1. Connect the 2 hoses to the water by-pass pipe.

  1. Install the No. 2 water by-pass pipe with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



    A191538
  1. Connect the 2 water hoses.



30. CONNECT VACUUM HOSE ASSEMBLY


    A191537
  1. Connect the hose to the intake manifold.

  1. Install the vacuum hose assembly with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



31. INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE


    A053994E01
  1. Install the sensor plate as shown in the illustration.

    NOTICE:
    Take care not to install it in a wrong direction.



32. INSTALL NO. 1 TIMING BELT COVER


    A072694E02
  1. Install the cover spacer and gasket.

  1. Install the timing belt cover with the 4 bolts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



33. INSTALL CRANKSHAFT PULLEY


    A160754E01
  1. Align the pulley set key with the key groove of the crankshaft pulley.

  1. Using SST and a hammer, tap in the crankshaft pulley.

    SST
    09223-46011  



    A160755E01
  1. Using SST, install the pulley set bolt.

    SST
    09213-70011  
    09330-00021  

    Torque:
    245 N*m{ 2498 kgf*cm , 181 ft.*lbf }



34. INSTALL FAN BRACKET SUB-ASSEMBLY


    A115076E02
  1. Install the fan bracket with the 2 bolts and 2 nuts.

    Torque:
    for nut A, bolt B:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }
    for nut C, bolt D:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf }



35. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY


    A072692E01
  1. Install the belt tensioner with the bolt and 2 nuts.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }



36. INSTALL NO. 2 TIMING BELT COVER SUB-ASSEMBLY


    A054467E01
  1. Install the timing belt cover and fit the claws and pins into each part.

  1. Install the 2 bolts.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }



37. INSTALL NO. 3 TIMING BELT COVER SUB-ASSEMBLY LH


    A014424E08
  1. Pass the camshaft position sensor wire through the cover hole.

  1. Install the cover with the 4 bolts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

  1. Install the wire grommet to the belt cover.

  1. Connect the sensor connector.

  1. Install the sensor wire to the wire clamps on the cover.

  1. Connect the engine wire to the 2 wire clamps on the cover.



38. INSTALL NO. 3 TIMING BELT COVER SUB-ASSEMBLY RH


    A123355
  1. Install the cover with the 3 bolts and nut.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



39. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY


    A110456
  1. Install the idler pulley and cover plate with the bolt.

    Torque:
    39 N*m{ 398 kgf*cm , 29 ft.*lbf }



40. INSTALL OIL COOLER PIPE


    A108784E04
  1. Using needle-nose pliers, grip the claws of the clamps and slide the clamps to connect the 3 water by-pass hoses.

  1. Install the oil cooler pipe with the cap nut and bolt.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



41. CONNECT COOLER COMPRESSOR ASSEMBLY


    A160758
  1. Connect the compressor. Then install it and the No. 1 compressor stay with the nut and 3 bolts.

    Torque:
    for bolt:
    47 N*m{ 479 kgf*cm , 35 ft.*lbf }
    for nut:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

  1. Connect the connector.



42. INSTALL GENERATOR ASSEMBLY


    A152262E01
  1. Install the generator with the bolt and 2 nuts.

    Torque:
    for bolt and nut (A):
    39 N*m{ 398 kgf*cm , 29 ft.*lbf }
    for nut (B):
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }



    A152261
  1. Connect the generator connector.

  1. Connect the generator wire with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Install the terminal cap.

  1. Install the harness bracket to the generator with the bolt.

    Torque:
    8.2 N*m{ 84 kgf*cm , 73 in.*lbf }



43. CONNECT VANE PUMP ASSEMBLY
  1. Connect the vane pump with the nut and 2 bolts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }

  1. Connect the connector.



44. INSTALL FLUID COUPLING ASSEMBLY
  1. Set the fan pulley to the fan bracket.



    A151756
  1. Set the fan together with the fan shroud into the vehicle.

    NOTICE:
    1. Be careful not to damage the radiator core.
    2. Make sure to attach the 2 claws of the fan shroud to the vehicle.

  1. Temporarily install the fan to the fan pulley with the 4 fluid coupling nuts.

  1. Install the fan shroud with the 2 bolts.

    Torque:
    6.5 N*m{ 66 kgf*cm , 58 in.*lbf }



    A123358
  1. Tighten the 4 fluid coupling nuts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }



45. INSTALL FAN AND GENERATOR V BELT


    A053117E03
  1. Set the V belt onto every part except the No. 2 idler pulley, as shown in the illustration.

  1. Loosen the V belt by turning the belt tensioner counterclockwise.

  1. Set the V belt to the No. 2 idler pulley.



    A141644E02
  1. After installing the belt, check that it fits properly in the ribbed grooves.

  1. Check by hand to confirm that the belt has not slipped out of the grooves on the bottom of the pulley.



    A141645E01
  1. Check that the arrow on the belt tensioner is within area "A".
    If it is outside area "A", replace the fan and generator V belt.

    HINT:
    When a new belt is installed, the arrow should be within area "B". If not, the fan and generator V belt is not installed correctly.



46. INSTALL RADIATOR HOSE OUTLET


47. INSTALL RADIATOR HOSE INLET


48. INSTALL AIR CLEANER ASSEMBLY


    A156197
  1. Install the air cleaner case with the 2 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Install the air cleaner element onto the air cleaner case.



    A156196E01
  1. Install the air cleaner cap.

    1. Fasten the 4 hook clamps.

    2. Connect the MAF meter connector.

    3. Attach the wire harness clamp.



49. INSTALL AIR CLEANER HOSE ASSEMBLY


    A153488E01
  1. Install the air cleaner hose.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

    HINT:
    Make sure that the clamp band end is aligned with the limit mark when the hose clamp is tightened, as indicated by A and B in the illustration.

  1. Connect the vacuum hose.

  1. Connect the No. 2 ventilation hose.



50. INSTALL THROTTLE BODY COVER SUB-ASSEMBLY


    A153486
  1. Install the throttle body cover sub-assembly with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



51. INSTALL COWL TOP OUTER PANEL SUB-ASSEMBLY


  1. Install the outer panel with the 7 bolts.


    A151796

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

  1. Connect the 2 washer hoses.



52. INSTALL WINDSHIELD WIPER MOTOR ASSEMBLY
  1. Install the windshield wiper motor (Click here).



53. INSTALL FRONT EXHAUST PIPE ASSEMBLY
  1. for Regular cab standard deck, refer to the following procedures (Click here).

  1. except Regular cab standard deck, refer to the following procedures (Click here).



54. ADD ENGINE OIL
  1. Install a new gasket and the drain plug.

    Torque:
    39 N*m{ 398 kgf*cm , 29 ft.*lbf }

  1. Add new oil.

    Standard engine oil:
    Oil grade
    Oil Viscosity (SAE)
    ILSAC multigrade engine oil
    5W-30
    (5W-30 is the best choice for this vehicle for good fuel economy and good starting in cold weather.)

    Standard oil capacity:
    Item
    Specified Condition
    Drain and refill with oil filter change
    6.2 liters (6.6 US qts, 5.5 Imp. qts)
    Drain and refill without oil filter change
    5.7 liters (6.0 US qts, 5.0 Imp. qts)
    Dry fill
    7.1 liters (7.5 US qts, 6.2 Imp. qts)

  1. Install the oil filler cap.



55. ADD ENGINE COOLANT
  1. Add engine coolant.

    Standard capacity:
    9.7 liters (10.3 US qts, 8.5 Imp. qts)

    HINT:
    1. TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology is a combination of low phosphates and organic acids).
    2. The thermostat opening timing can be confirmed by pressing the inlet radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.



    A151850E03
  1. Slowly pour coolant into the radiator reservoir until it reaches the FULL line.

  1. Install the reservoir cap.

  1. Press the inlet and outlet radiator hoses several times by hand, and then check the coolant level. If the coolant level is low, add coolant.

  1. Install the radiator cap.

  1. Start the engine and warm it up until the thermostat opens.

    HINT:
    The thermostat opening timing can be confirmed by pressing the inlet radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.

  1. Maintain the engine speed at 2000 to 2500 rpm and warm up the engine until the cooling fan operates.

    NOTICE:
    1. Make sure that the radiator reservoir still has some coolant in it.
    2. Pay attention to the needle of the water temperature meter. Make sure that the needle does not show an abnormally high temperature.
    3. If there is not enough coolant, the engine may burn out or overheat.
    4. Immediately after starting the engine, if the radiator reservoir does not have any coolant, perform the following: 1) stop the engine, 2) wait until the coolant has cooled down, and 3) add coolant until the coolant is filled to the FULL line.
    5. Run the engine at 2000 rpm until the coolant level has stabilized.

  1. Press the inlet and outlet radiator hoses several times by hand to bleed air.

    CAUTION:
    1. Wear protective gloves.
    2. Be careful as the radiator hoses are hot.
    3. Keep your hands away from the fan.

  1. Stop the engine, and wait until the engine coolant cools down to ambient temperature.

    CAUTION:
    Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.



    A151850E04
  1. Check that the coolant level is between the FULL and LOW lines. If the coolant level is below the LOW line, repeat all of the procedures above. If the coolant level is above the FULL line, drain coolant so that the coolant level is between the FULL and LOW lines.



56. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
Some systems need to be initialized after the cable is reconnected (Click here).



57. INSPECT FOR OIL LEAK
  1. Start the engine. Make sure that there are no oil leaks from the area that was worked on.



58. INSPECT FOR COOLANT LEAK

CAUTION:
Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.



    A162054
  1. Fill the radiator with coolant and attach a radiator cap tester.

  1. Warm up the engine.

  1. Using the radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf/cm2, 17 psi), and check that the pressure does not drop. If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and head.



59. INSPECT FOR FUEL LEAK
  1. Connect the Techstream to the DLC3.

  1. Turn the ignition switch to ON and Techstream main switch ON.

    NOTICE:
    Do not start the engine.

  1. Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump / Speed.

  1. Check that there are no fuel leaks after doing maintenance anywhere on the fuel system.



    A133618E01
  1. Check that the pulsation damper screw rises up when the fuel pump operates.
    If the operation is not as specified, check the following parts:

    1. Fusible link
    2. Fuses
    3. Circuit opening relay
    4. Fuel pump
    5. ECM
    6. Wiring connections
    If no malfunctions are found in the aforementioned components, replace the pulsation damper.

  1. Turn the ignition switch OFF.

  1. Disconnect the Techstream from the DLC3.



60. INSPECT FOR EXHAUST GAS LEAK
If gas is leaking, tighten the areas necessary to stop the leak. Replace damaged parts as necessary.


61. CHECK ENGINE OIL LEVEL
  1. Warm up the engine, then stop the engine and wait for 5 minutes.

  1. Check that the engine oil level is between the low level and full level marks on the dipstick.
    If low, check for leakage and add oil up to the full level mark.

    NOTICE:
    Do not fill engine oil above the full level mark.



62. INSPECT IGNITION TIMING
  1. Warm up and stop the engine.

    1. Allow the engine to warm up to a normal operating temperature.

  1. When using the Techstream:

    1. Connect the Techstream to the DLC3.

    2. Start the engine and idle it.

    3. Push the Techstream main switch ON.

    4. Enter the following menus: Powertrain / Engine and ECT / Data List / Primary / IGN Advance.

      HINT:
      Refer to the Techstream operator's manual for further details.

      Standard ignition timing:
      5 to 15° BTDC @ idling (transmission in neutral and A/C switch OFF)

    5. Disconnect the Techstream from the DLC3.



    A123205
  1. When not using the Techstream:

    1. Connect the tester probe of a timing light to the wire of the ignition coil connector for the No. 1 cylinder.

      NOTICE:
      Use a timing light that detects primary signals.



    2. H102392E79
    3. Using SST, connect terminals 13 (TC) and 4 (CG) of the DLC3.

      SST
      09843-18040  

      NOTICE:
      Confirm the terminal numbers before connecting them. Connecting the wrong terminals can damage the engine.



    4. A004459E01
    5. Using the timing light, check the ignition timing.

      Ignition timing:
      5 to 15° BTDC @ idling (transmission in neutral and A/C switch OFF)

    6. Remove SST from the DLC3.

    7. Disconnect the timing light from the engine.



63. INSPECT ENGINE IDLE SPEED
  1. Warm up and stop the engine.

    1. Allow the engine to warm up to a normal operating temperature.

  1. When using the Techstream:

    1. Connect the Techstream to the DLC3.

      NOTICE:
      Switch off all accessories and the A/C before connecting the Techstream.

    2. Race the engine at 2500 rpm for approximately 90 seconds.

    3. Push the Techstream main switch ON.

    4. Enter the following menus: Powertrain / Engine and ECT / Data List / Primary / Engine Speed.

      Standard idle speed:
      650 to 750 rpm (transmission in neutral and A/C switch OFF)

      HINT:
      Refer to the Techstream operator's manual for further details.

      If the idle speed is not as specified, check the air intake system.

    5. Disconnect the Techstream from the DLC3.



    H102392E88
  1. When not using the Techstream:

    1. Using SST, connect the tachometer probe to terminal 9 (TAC) of the DLC3.

      SST
      09843-18030  

      NOTICE:
      Confirm the terminal numbers before connecting them. Connecting the wrong terminals can damage the engine.

    2. Race the engine at 2500 rpm for approximately 90 seconds.

    3. Check the idle speed.

      Idle speed:
      650 to 750 rpm (transmission in neutral and A/C switch OFF)

      If the idle speed is not as specified, check the air intake system.

    4. Disconnect the tachometer from the DLC3.



64. INSTALL NO. 1 ENGINE UNDER COVER


    A150108
  1. Hook the engine under cover onto the vehicle body as shown in the illustration.

  1. Install the 3 screws and 5 bolts.

    Torque:
    for bolt:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }
    for screw:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }