CYLINDER HEAD GASKET (for Bank 1) > INSTALLATION |
| 1. INSPECT CYLINDER HEAD SET BOLT |
![]() |
Using a vernier caliper, measure the thread outside diameter of the bolt.
| Item | Specified Condition |
| Intake side | 82 mm (3.23 in.) |
| Exhaust side | 86 mm (3.39 in.) |
| 2. INSPECT CYLINDER HEAD |
![]() |
Using a precision straightedge and feeler gauge, measure the surfaces contacting the cylinder block and manifolds for warpage.
| Item | Specified Condition |
| Cylinder block side | 0.10 mm (0.00394 in.) |
| Intake manifold side | 0.10 mm (0.00394 in.) |
| Exhaust manifold side | 0.10 mm (0.00394 in.) |
![]() |
Using a dye penetrant, check the combustion chamber, intake ports, exhaust ports and cylinder block surface for cracks.
If the cylinder head is cracked, replace it.
| 3. INSTALL CYLINDER HEAD GASKET LH |
![]() |
Clean the cylinder block and cylinder head with solvent.
Place a new cylinder head gasket in position on the cylinder block.
| 4. INSTALL CYLINDER HEAD LH |
![]() |
Check that the timing mark of the crankshaft timing pulley is in the position shown in the illustration, and that the piston is below the TDC of compression.
Install the cylinder head with the exhaust manifold to the cylinder block.
Apply a light coat of engine oil to the threads and under the heads of the cylinder head bolts.
Step 1:
Set the plate washer to the cylinder head bolt.
![]() |
Install and uniformly tighten the 10 cylinder head bolts and plate washers in the sequence shown in the illustration.
Step 2:
![]() |
Mark the cylinder head bolt head with paint as shown in the illustration.
Tighten the cylinder head bolts another 90° in the sequence shown in step 1.
Step 3:
Tighten the cylinder head bolts another 90° in the sequence shown in step 1.
Check that the painted marks are now facing rearward.
| 5. INSTALL VALVE LIFTER |
Apply a light coat of engine oil to the valve lifters and shims.
Install the valve lifters and shims to the cylinder head.
Check that the valve lifter rotates smoothly by hand.
| 6. INSTALL CAMSHAFT SETTING OIL SEAL |
![]() |
Insert 2 new oil seals into the camshaft timing tube until they reach the stopper.
| 7. INSTALL CAMSHAFT TIMING TUBE ASSEMBLY |
![]() |
Align the timing tube knock pin with the knock pin groove of the drive gear, and temporarily install the drive gear with the 4 bolts.
Using SST and a 5 mm hexagon wrench, uniformly tighten the 4 bolts in several steps.
![]() |
Mount the hexagonal portion of the camshaft in a vise.
![]() |
Align the camshaft knock pin with the knock pin groove of the timing tube, and push the timing tube by hand until it touches the bottom.
Using a 10 mm hexagon wrench, install the bolt.
Install the seal washer and screw plug.
| 8. INSTALL CAMSHAFT SUB-ASSEMBLY LH |
![]() |
Apply a light coat of engine oil to the cam lobe and gear of the camshaft and also the journal of the cylinder head.
![]() |
Using a wrench, align the timing marks (2 dot marks each) of the camshaft drive and driven main gears, and set the No. 3 and No. 4 camshafts in place.
Install the bearing cap.
![]() |
Apply seal packing to the camshaft housing plug groove.
![]() |
Install the camshaft housing plug and oil control valve filter to the cylinder head as shown in the illustration.
![]() |
Apply seal packing to the No. 1 bearing cap as shown in the illustration.
![]() |
Install 4 new seal washers to the bearing cap bolts (A and B).
Apply a light coat of engine oil to the threads and under the heads of the bearing cap bolts (C to E).
![]() |
Temporarily install the oil feed pipe and bearing caps with the 22 bolts, as shown in the illustration.
| Item | Length |
| Bolt A with seal washer | 94 mm (3.70 in.) |
| Bolt B with seal washer | 72 mm (2.84 in.) |
| Bolt C | 25 mm (0.984 in.) |
| Bolt D | 55 mm (2.17 in.) |
| Bolt E | 40 mm (1.58 in.) |
![]() |
Push in the camshaft setting oil seal.
![]() |
Uniformly tighten the 22 bearing cap bolts in several steps, in the sequence shown in the illustration.
![]() |
Bring the service bolt installed in the driven sub-gear upward by turning the hexagonal portion of the camshaft with a wrench.
Remove the service bolt.
| 9. INSTALL REAR NO. 1 TIMING BELT PLATE LH |
Install the No. 1 timing belt plate and No. 2 timing plate with the 2 bolts.
| 10. INSTALL CAMSHAFT TIMING PULLEY LH |
![]() |
Align the camshaft timing tube knock pin with the knock pin groove of the timing pulley.
Temporarily install the 4 bolts of the camshaft timing pulley.
Hold the hexagonal portion of the camshaft with a wrench.
Using a 5 mm hexagon wrench, tighten the 4 bolts.
| 11. INSTALL CAMSHAFT POSITION SENSOR ASSEMBLY |
![]() |
Install the camshaft position sensor with the bolt and stud bolt.
| 12. INSTALL TIMING BELT |
![]() |
Set the No. 1 cylinder to TDC/compression.
Turn the hexagonal portion of the camshaft to align the timing marks of the camshaft timing pulleys and timing belt plates.
![]() |
Using the pulley set bolt, turn the crankshaft to align the timing marks of the crankshaft timing pulley and oil pump body.
![]() |
Install the timing belt.
Remove any oil or water from each pulley, and keep them clean.
Face the front mark (arrow) on the timing belt forward.
Set the timing belt on the crankshaft timing pulley.
Set the timing belt on the No. 2 timing belt idler.
Set the timing belt on the camshaft timing pulley (for bank 1).
Set the timing belt on the water pump pulley.
Set the timing belt on the camshaft timing pulley (for bank 2).
Set the timing belt on the No. 1 timing belt idler.
![]() |
Install the belt tensioner.
Using a press, slowly press in the push rod using 981 to 9807 N (100 to 1000 kgf, 220.5 to 2204.7 lbf) of force.
Align the holes of the push rod and housing, and pass a 1.5 mm hexagon wrench through the holes to keep the setting position of the push rod.
Release the press.
Install the dust boot to the belt tensioner.
![]() |
Temporarily install the belt tensioner with the 2 bolts.
Tighten the 2 bolts.
Using pliers, remove the 1.5 mm hexagon wrench from the timing belt tensioner.
| 13. CHECK NO. 1 CYLINDER TO TDC / COMPRESSION |
![]() |
Using the pulley set bolt, slowly turn the crankshaft pulley 2 revolutions from the TDC to TDC.
Check that each pulley is aligned with each timing mark as shown in the illustration.
If the timing marks are not aligned, remove the timing belt and reinstall it.
Remove the pulley set bolt.
| 14. INSPECT VALVE CLEARANCE |
Inspect the valve clearance .
If the result is not as specified, adjust the valve clearance .
| 15. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH |
![]() |
Apply seal packing to the semicircular plug grooves.
Install the 2 semicircular plugs to the cylinder heads.
Install the gasket to the cylinder head cover.
![]() |
Apply seal packing to the cylinder head as shown in the illustration.
![]() |
Install the cylinder head cover with the 9 bolts. Uniformly tighten the bolts in several steps.
| 16. INSTALL SPARK PLUG |
| 17. INSTALL IGNITION COIL ASSEMBLY |
![]() |
Install the 8 ignition coils with the 8 bolts.
Connect the 8 ignition coil connectors.
| 18. INSTALL REAR WATER BY-PASS JOINT |
![]() |
Install 2 new gaskets and the water by-pass joint with the 4 nuts and connect the air hose.
![]() |
| 19. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY |
![]() |
Apply soapy water to a new O-ring and install it to the water by-pass pipe.
Push in the water by-pass pipe end into the pipe hole of the water pump.
Install the water by-pass pipe with the bolt.
| 20. INSTALL FRONT WATER BY-PASS JOINT |
![]() |
Install 2 new gaskets and the water by-pass joint with the 4 nuts.
![]() |
| 21. INSTALL WATER INLET HOUSING |
![]() |
Apply seal packing in a continuous line to the places shown in the illustration.
Apply soapy water to a new O-ring and install it to the water inlet housing.
![]() |
Temporarily install the water inlet housing with the 2 bolts. Uniformly tighten the bolts in several steps.
| Item | Length |
| Bolt A | 77 mm (3.03 in.) |
| Bolt B | 22 mm (0.866 in.) |
Connect the water by-pass hose to the water inlet housing.
| 22. INSTALL INTAKE MANIFOLD |
![]() |
Place 2 new gaskets on the intake manifold.
Place the intake manifold on the cylinder heads.
![]() |
Install and uniformly tighten the 6 bolts and 4 nuts in several steps.
![]() |
Install the engine wire protector with the 2 bolts.
Connect the 8 injector connectors.
![]() |
Connect the 2 wire clamps to the wire clamp brackets on the RH delivery pipe.
![]() |
Connect the VSV connector (for ACIS).
![]() |
Install the wire bracket to the intake manifold with the bolt.
Connect the engine wire to the wire bracket and engine hanger.
![]() |
Connect the purge line hose to the purge VSV.
Connect the purge VSV connector.
![]() |
Connect the No. 1 ventilation hose to the ventilation valve on the LH cylinder head.
![]() |
Connect the 2 water by-pass hoses to the throttle body.
Connect the throttle position sensor and control motor connector.
| 23. INSTALL AIR SWITCHING VALVE ASSEMBLY (for Bank 1) |
![]() |
Install the air switching valve with the 3 nuts.
| 24. INSTALL NO. 3 AIR TUBE |
![]() |
Temporarily install a new gasket and the No. 3 air tube to the exhaust manifold side with the 2 nuts.
Install a new gasket and the No. 3 air tube to the air switching valve side with the 2 nuts.
Tighten the 2 nuts on the exhaust manifold side.
| 25. INSTALL NO. 2 AIR HOSE |
![]() |
Install the No. 2 air hose.
![]() |
Connect the air pump connector.
Connect the fuel hose clamp.
| 26. INSTALL FRONT FENDER APRON SEAL LH |
![]() |
Install the fender apron seal with the 5 clips.
| 27. CONNECT FUEL MAIN TUBE |
![]() |
Connect the fuel main tube (Click here).
Install the fuel pipe clamp.
| 28. CONNECT FUEL RETURN TUBE |
![]() |
Connect the fuel return tube (Click here).
| 29. INSTALL NO. 2 WATER BY-PASS PIPE |
![]() |
Connect the 2 hoses to the water by-pass pipe.
Install the No. 2 water by-pass pipe with the 2 bolts.
![]() |
Connect the 2 water hoses.
| 30. CONNECT VACUUM HOSE ASSEMBLY |
![]() |
Connect the hose to the intake manifold.
Install the vacuum hose assembly with the bolt.
| 31. INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE |
![]() |
Install the sensor plate as shown in the illustration.
| 32. INSTALL NO. 1 TIMING BELT COVER |
![]() |
Install the cover spacer and gasket.
Install the timing belt cover with the 4 bolts.
| 33. INSTALL CRANKSHAFT PULLEY |
![]() |
Align the pulley set key with the key groove of the crankshaft pulley.
Using SST and a hammer, tap in the crankshaft pulley.
![]() |
Using SST, install the pulley set bolt.
| 34. INSTALL FAN BRACKET SUB-ASSEMBLY |
![]() |
Install the fan bracket with the 2 bolts and 2 nuts.
| 35. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY |
![]() |
Install the belt tensioner with the bolt and 2 nuts.
| 36. INSTALL NO. 2 TIMING BELT COVER SUB-ASSEMBLY |
![]() |
Install the timing belt cover and fit the claws and pins into each part.
Install the 2 bolts.
| 37. INSTALL NO. 3 TIMING BELT COVER SUB-ASSEMBLY LH |
![]() |
Pass the camshaft position sensor wire through the cover hole.
Install the cover with the 4 bolts.
Install the wire grommet to the belt cover.
Connect the sensor connector.
Install the sensor wire to the wire clamps on the cover.
Connect the engine wire to the 2 wire clamps on the cover.
| 38. INSTALL NO. 3 TIMING BELT COVER SUB-ASSEMBLY RH |
![]() |
Install the cover with the 3 bolts and nut.
| 39. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY |
![]() |
Install the idler pulley and cover plate with the bolt.
| 40. INSTALL OIL COOLER PIPE |
![]() |
Using needle-nose pliers, grip the claws of the clamps and slide the clamps to connect the 3 water by-pass hoses.
Install the oil cooler pipe with the cap nut and bolt.
| 41. CONNECT COOLER COMPRESSOR ASSEMBLY |
![]() |
Connect the compressor. Then install it and the No. 1 compressor stay with the nut and 3 bolts.
Connect the connector.
| 42. INSTALL GENERATOR ASSEMBLY |
![]() |
Install the generator with the bolt and 2 nuts.
![]() |
Connect the generator connector.
Connect the generator wire with the nut.
Install the terminal cap.
Install the harness bracket to the generator with the bolt.
| 43. CONNECT VANE PUMP ASSEMBLY |
Connect the vane pump with the nut and 2 bolts.
Connect the connector.
| 44. INSTALL FLUID COUPLING ASSEMBLY |
Set the fan pulley to the fan bracket.
![]() |
Set the fan together with the fan shroud into the vehicle.
Temporarily install the fan to the fan pulley with the 4 fluid coupling nuts.
Install the fan shroud with the 2 bolts.
![]() |
Tighten the 4 fluid coupling nuts.
| 45. INSTALL FAN AND GENERATOR V BELT |
![]() |
Set the V belt onto every part except the No. 2 idler pulley, as shown in the illustration.
Loosen the V belt by turning the belt tensioner counterclockwise.
Set the V belt to the No. 2 idler pulley.
![]() |
After installing the belt, check that it fits properly in the ribbed grooves.
Check by hand to confirm that the belt has not slipped out of the grooves on the bottom of the pulley.
![]() |
Check that the arrow on the belt tensioner is within area "A".
If it is outside area "A", replace the fan and generator V belt.
| 46. INSTALL RADIATOR HOSE OUTLET |
| 47. INSTALL RADIATOR HOSE INLET |
| 48. INSTALL AIR CLEANER ASSEMBLY |
![]() |
Install the air cleaner case with the 2 bolts.
Install the air cleaner element onto the air cleaner case.
![]() |
Install the air cleaner cap.
Fasten the 4 hook clamps.
Connect the MAF meter connector.
Attach the wire harness clamp.
| 49. INSTALL AIR CLEANER HOSE ASSEMBLY |
![]() |
Install the air cleaner hose.
Connect the vacuum hose.
Connect the No. 2 ventilation hose.
| 50. INSTALL THROTTLE BODY COVER SUB-ASSEMBLY |
![]() |
Install the throttle body cover sub-assembly with the 2 nuts.
| 51. INSTALL COWL TOP OUTER PANEL SUB-ASSEMBLY |
Install the outer panel with the 7 bolts.

Connect the 2 washer hoses.
| 52. INSTALL WINDSHIELD WIPER MOTOR ASSEMBLY |
Install the windshield wiper motor (Click here).
| 53. INSTALL FRONT EXHAUST PIPE ASSEMBLY |
for Regular cab standard deck, refer to the following procedures (Click here).
except Regular cab standard deck, refer to the following procedures (Click here).
| 54. ADD ENGINE OIL |
Install a new gasket and the drain plug.
Add new oil.
| Oil grade | Oil Viscosity (SAE) |
| ILSAC multigrade engine oil | 5W-30 (5W-30 is the best choice for this vehicle for good fuel economy and good starting in cold weather.) |
| Item | Specified Condition |
| Drain and refill with oil filter change | 6.2 liters (6.6 US qts, 5.5 Imp. qts) |
| Drain and refill without oil filter change | 5.7 liters (6.0 US qts, 5.0 Imp. qts) |
| Dry fill | 7.1 liters (7.5 US qts, 6.2 Imp. qts) |
Install the oil filler cap.
| 55. ADD ENGINE COOLANT |
Add engine coolant.
![]() |
Slowly pour coolant into the radiator reservoir until it reaches the FULL line.
Install the reservoir cap.
Press the inlet and outlet radiator hoses several times by hand, and then check the coolant level. If the coolant level is low, add coolant.
Install the radiator cap.
Start the engine and warm it up until the thermostat opens.
Maintain the engine speed at 2000 to 2500 rpm and warm up the engine until the cooling fan operates.
Press the inlet and outlet radiator hoses several times by hand to bleed air.
Stop the engine, and wait until the engine coolant cools down to ambient temperature.
![]() |
Check that the coolant level is between the FULL and LOW lines. If the coolant level is below the LOW line, repeat all of the procedures above. If the coolant level is above the FULL line, drain coolant so that the coolant level is between the FULL and LOW lines.
| 56. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 57. INSPECT FOR OIL LEAK |
Start the engine. Make sure that there are no oil leaks from the area that was worked on.
| 58. INSPECT FOR COOLANT LEAK |
![]() |
Fill the radiator with coolant and attach a radiator cap tester.
Warm up the engine.
Using the radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf/cm2, 17 psi), and check that the pressure does not drop. If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and head.
| 59. INSPECT FOR FUEL LEAK |
Connect the Techstream to the DLC3.
Turn the ignition switch to ON and Techstream main switch ON.
Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump / Speed.
Check that there are no fuel leaks after doing maintenance anywhere on the fuel system.
![]() |
Check that the pulsation damper screw rises up when the fuel pump operates.
If the operation is not as specified, check the following parts:
Turn the ignition switch OFF.
Disconnect the Techstream from the DLC3.
| 60. INSPECT FOR EXHAUST GAS LEAK |
| 61. CHECK ENGINE OIL LEVEL |
Warm up the engine, then stop the engine and wait for 5 minutes.
Check that the engine oil level is between the low level and full level marks on the dipstick.
If low, check for leakage and add oil up to the full level mark.
| 62. INSPECT IGNITION TIMING |
Warm up and stop the engine.
Allow the engine to warm up to a normal operating temperature.
When using the Techstream:
Connect the Techstream to the DLC3.
Start the engine and idle it.
Push the Techstream main switch ON.
Enter the following menus: Powertrain / Engine and ECT / Data List / Primary / IGN Advance.
Disconnect the Techstream from the DLC3.
![]() |
When not using the Techstream:
Connect the tester probe of a timing light to the wire of the ignition coil connector for the No. 1 cylinder.
![]() |
Using SST, connect terminals 13 (TC) and 4 (CG) of the DLC3.
![]() |
Using the timing light, check the ignition timing.
Remove SST from the DLC3.
Disconnect the timing light from the engine.
| 63. INSPECT ENGINE IDLE SPEED |
Warm up and stop the engine.
Allow the engine to warm up to a normal operating temperature.
When using the Techstream:
Connect the Techstream to the DLC3.
Race the engine at 2500 rpm for approximately 90 seconds.
Push the Techstream main switch ON.
Enter the following menus: Powertrain / Engine and ECT / Data List / Primary / Engine Speed.
Disconnect the Techstream from the DLC3.
![]() |
When not using the Techstream:
Using SST, connect the tachometer probe to terminal 9 (TAC) of the DLC3.
Race the engine at 2500 rpm for approximately 90 seconds.
Check the idle speed.
Disconnect the tachometer from the DLC3.
| 64. INSTALL NO. 1 ENGINE UNDER COVER |
![]() |
Hook the engine under cover onto the vehicle body as shown in the illustration.
Install the 3 screws and 5 bolts.