Home › ENGINE ยท 2UZ-FE › EMISSION CONTROL › AIR PUMP (for Bank 2)

AIR PUMP (for Bank 2) > INSTALLATION

for Preparation Click here



1. INSTALL AIR PUMP ASSEMBLY


A153503E01
  1. Insert the slot over the stud and bracket tab into the slot (View A).

  1. Insert the bracket tab into the slot (View B).

  1. Install the 2 nuts and bolt.

    Torque:
    for bolt:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }
    for nut:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }



2. INSTALL NO. 2 AIR INJECTION SYSTEM HOSE


    A158138E02
  1. Install the air injection system hose as shown in the illustration.



    A153497
  1. Connect the air pump connector.

  1. Connect the 2 clamps.



    A153461
  1. Install the fender apron seal with the 2 clips.



3. INSTALL FRONT FENDER LINER RH


    A160255
  1. Install the fender liner with the 9 clips.



4. INSTALL AIR CLEANER HOSE ASSEMBLY


    A153488E01
  1. Install the air cleaner hose.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

    HINT:
    Make sure that the clamp band end is aligned with the limit mark when the hose clamp is tightened, as indicated by A and B in the illustration.

  1. Connect the vacuum hose.

  1. Connect the No. 2 ventilation hose.



5. INSTALL THROTTLE BODY COVER SUB-ASSEMBLY


    A153486
  1. Install the throttle body cover sub-assembly with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
Some systems need to be initialized after the cable is reconnected (Click here).