INTAKE MANIFOLD > INSTALLATION |
| 1. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY |
![]() |
Place the 2 delivery pipes and injector assemblies on the lower intake manifold.
Temporarily install the 4 nuts.
Install the front fuel pipe with the bolt, 4 new gaskets and 2 union bolts.
![]() |
Install the fuel return pipe with the 3 bolts.
![]() |
Connect the fuel return hose to the fuel pressure regulator.
![]() |
Check that the injectors rotate smoothly.
Position the injector connectors outward.
Tighten the 4 nuts holding the delivery pipes to the lower intake manifold.
Connect the 8 injector connectors.
| 2. INSTALL VACUUM SWITCHING VALVE ASSEMBLY (for ACIS) |
Connect the VSV connector.
![]() |
Install the VSV connector and VSV to the intake manifold with the 2 bolt.
Connect the 2 vacuum hoses to the VSV.
| 3. INSTALL PURGE VSV |
![]() |
Install the VSV with the bolt to the intake manifold.
Connect the purge line hose to the intake manifold.
| 4. INSTALL NO. 1 VENTILATION HOSE |
| 5. INSTALL THROTTLE BODY ASSEMBLY |
![]() |
Align the protrusion of a new gasket with the groove of the intake manifold, and install the gasket.
![]() |
Install the throttle body with the nut and 3 bolts.
| 6. INSTALL INTAKE MANIFOLD ASSEMBLY |
![]() |
Place 2 new gaskets on the intake manifold.
Place the intake manifold on the cylinder heads.
![]() |
Install and uniformly tighten the 6 bolts and 4 nuts in several steps.
![]() |
Install the engine wire protector with the 2 bolts.
Connect the 8 injector connectors.
![]() |
Connect the 2 wire clamps to the wire clamp brackets on the RH delivery pipe.
![]() |
Connect the VSV connector (for ACIS).
![]() |
Install the wire bracket to the intake manifold with the bolt.
Connect the engine wire to the wire bracket and engine hanger.
![]() |
Connect the purge line hose to the purge VSV.
Connect the purge VSV connector.
![]() |
Connect the No. 1 ventilation hose to the ventilation valve on the LH cylinder head.
![]() |
Connect the 2 water by-pass hoses to the throttle body.
Connect the throttle position sensor and control motor connector.
| 7. INSTALL FUEL MAIN TUBE |
![]() |
Connect the fuel main tube (Click here).
Install the fuel pipe clamp.
| 8. INSTALL FUEL RETURN TUBE |
![]() |
Connect the fuel return tube (Click here).
| 9. INSTALL NO. 2 WATER BY-PASS PIPE |
![]() |
Connect the 2 hoses to the water by-pass pipe.
Install the No. 2 water by-pass pipe with the 2 bolts.
![]() |
Connect the 2 water hoses.
| 10. INSTALL VACUUM HOSE ASSEMBLY |
![]() |
Connect the hose to the intake manifold.
Install the vacuum hose assembly with the bolt.
| 11. INSTALL AIR CLEANER HOSE ASSEMBLY |
![]() |
Install the air cleaner hose.
Connect the vacuum hose and No. 2 ventilation hose.
| 12. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 13. ADD ENGINE COOLANT |
Add engine coolant.
![]() |
Slowly pour coolant into the radiator reservoir until it reaches the FULL line.
Install the reservoir cap.
Press the inlet and outlet radiator hoses several times by hand, and then check the coolant level. If the coolant level is low, add coolant.
Install the radiator cap.
Start the engine and warm it up until the thermostat opens.
Maintain the engine speed at 2000 to 2500 rpm and warm up the engine until the cooling fan operates.
Press the inlet and outlet radiator hoses several times by hand to bleed air.
Stop the engine, and wait until the engine coolant cools down to ambient temperature.
![]() |
Check that the coolant level is between the FULL and LOW lines. If the coolant level is below the LOW line, repeat all of the procedures above. If the coolant level is above the FULL line, drain coolant so that the coolant level is between the FULL and LOW lines.
| 14. INSPECT FOR COOLANT LEAK |
![]() |
Fill the radiator with coolant and attach a radiator cap tester.
Warm up the engine.
Using the radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf/cm2, 17 psi), and check that the pressure does not drop. If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and head.
| 15. INSPECT FOR FUEL LEAK |
Connect the Techstream to the DLC3.
Turn the ignition switch to ON and Techstream main switch ON.
Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump / Speed.
Check that there are no fuel leaks after doing maintenance anywhere on the fuel system.
| 16. INSTALL NO. 1 ENGINE UNDER COVER |
![]() |
Hook the engine under cover onto the vehicle body as shown in the illustration.
Install the 3 screws and 5 bolts.
| 17. INSTALL THROTTLE BODY COVER SUB-ASSEMBLY |
![]() |
Install the 2 throttle body cover brackets with the 2 bolts.
![]() |
Install the throttle body cover with the 2 cap nuts.
| 18. INSTALL FRONT COWL TOP OUTER PANEL SUB-ASSEMBLY |
Install the outer panel with the 7 bolts.

Connect the 2 washer hoses.
| 19. INSTALL FRONT WIPER MOTOR AND LINK |
For the front wiper motor and link, refer to the following procedures (Click here).