Home › ENGINE ยท 2UZ-FE › INTAKE › INTAKE MANIFOLD

INTAKE MANIFOLD > INSTALLATION

for Preparation Click here



1. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY

NOTICE:
Be careful not to drop the injectors when installing the delivery pipes.



    A162032E01
  1. Place the 2 delivery pipes and injector assemblies on the lower intake manifold.

  1. Temporarily install the 4 nuts.

  1. Install the front fuel pipe with the bolt, 4 new gaskets and 2 union bolts.

    Torque:
    for union bolt:
    39 N*m{ 398 kgf*cm , 29 ft.*lbf }
    for bolt:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



    A160921
  1. Install the fuel return pipe with the 3 bolts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



    A160920
  1. Connect the fuel return hose to the fuel pressure regulator.



    A133665E02
  1. Check that the injectors rotate smoothly.

    HINT:
    If the injectors do not rotate smoothly, a probable cause is the incorrect installation of the O-rings. Replace the O-ring of the injector that does not rotate smoothly.

  1. Position the injector connectors outward.

  1. Tighten the 4 nuts holding the delivery pipes to the lower intake manifold.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the 8 injector connectors.



2. INSTALL VACUUM SWITCHING VALVE ASSEMBLY (for ACIS)
  1. Connect the VSV connector.



    A156178
  1. Install the VSV connector and VSV to the intake manifold with the 2 bolt.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

  1. Connect the 2 vacuum hoses to the VSV.



3. INSTALL PURGE VSV


    A162052
  1. Install the VSV with the bolt to the intake manifold.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

  1. Connect the purge line hose to the intake manifold.



4. INSTALL NO. 1 VENTILATION HOSE


5. INSTALL THROTTLE BODY ASSEMBLY


    A156182E01
  1. Align the protrusion of a new gasket with the groove of the intake manifold, and install the gasket.



    A156180E01
  1. Install the throttle body with the nut and 3 bolts.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }



6. INSTALL INTAKE MANIFOLD ASSEMBLY


    A156181
  1. Place 2 new gaskets on the intake manifold.

  1. Place the intake manifold on the cylinder heads.



    A156172
  1. Install and uniformly tighten the 6 bolts and 4 nuts in several steps.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }



    A156173
  1. Install the engine wire protector with the 2 bolts.

    Torque:
    8.2 N*m{ 83 kgf*cm , 72 in.*lbf }

  1. Connect the 8 injector connectors.



    A163553
  1. Connect the 2 wire clamps to the wire clamp brackets on the RH delivery pipe.



    A163715
  1. Connect the VSV connector (for ACIS).



    A156174E02
  1. Install the wire bracket to the intake manifold with the bolt.

    Torque:
    8.2 N*m{ 83 kgf*cm , 72 in.*lbf }


    1. Connect the engine wire to the wire bracket and engine hanger.



    A156171
  1. Connect the purge line hose to the purge VSV.

  1. Connect the purge VSV connector.



    A191540E01
  1. Connect the No. 1 ventilation hose to the ventilation valve on the LH cylinder head.



    A156170
  1. Connect the 2 water by-pass hoses to the throttle body.

  1. Connect the throttle position sensor and control motor connector.



7. INSTALL FUEL MAIN TUBE


    A160925
  1. Connect the fuel main tube (Click here).

  1. Install the fuel pipe clamp.



8. INSTALL FUEL RETURN TUBE


    A160926
  1. Connect the fuel return tube (Click here).



9. INSTALL NO. 2 WATER BY-PASS PIPE


    A191539
  1. Connect the 2 hoses to the water by-pass pipe.

  1. Install the No. 2 water by-pass pipe with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



    A191538
  1. Connect the 2 water hoses.



10. INSTALL VACUUM HOSE ASSEMBLY


    A191537
  1. Connect the hose to the intake manifold.

  1. Install the vacuum hose assembly with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



11. INSTALL AIR CLEANER HOSE ASSEMBLY


    A153488E01
  1. Install the air cleaner hose.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

    HINT:
    Make sure that the clamp band end is aligned with the limit mark when the hose clamps is tightened, as indicated by A and B in the illustration.

  1. Connect the vacuum hose and No. 2 ventilation hose.



12. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
Some systems need to be initialized after the cable is reconnected (Click here).



13. ADD ENGINE COOLANT
  1. Add engine coolant.

    Standard capacity:
    9.7 liters (10.3 US qts, 8.5 Imp. qts)

    HINT:
    1. TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology is a combination of low phosphates and organic acids).
    2. The thermostat opening timing can be confirmed by pressing the inlet radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.



    A151850E03
  1. Slowly pour coolant into the radiator reservoir until it reaches the FULL line.

  1. Install the reservoir cap.

  1. Press the inlet and outlet radiator hoses several times by hand, and then check the coolant level. If the coolant level is low, add coolant.

  1. Install the radiator cap.

  1. Start the engine and warm it up until the thermostat opens.

    HINT:
    The thermostat opening timing can be confirmed by pressing the inlet radiator hose by hand, and checking when the engine coolant starts to flow inside the hose.

  1. Maintain the engine speed at 2000 to 2500 rpm and warm up the engine until the cooling fan operates.

    NOTICE:
    1. Make sure that the radiator reservoir still has some coolant in it.
    2. Pay attention to the needle of the water temperature meter. Make sure that the needle does not show an abnormally high temperature.
    3. If there is not enough coolant, the engine may burn out or overheat.
    4. Immediately after starting the engine, if the radiator reservoir does not have any coolant, perform the following: 1) stop the engine, 2) wait until the coolant has cooled down, and 3) add coolant until the coolant is filled to the FULL line.
    5. Run the engine at 2000 rpm until the coolant level has stabilized.

  1. Press the inlet and outlet radiator hoses several times by hand to bleed air.

    CAUTION:
    1. Wear protective gloves.
    2. Be careful as the radiator hoses are hot.
    3. Keep your hands away from the fan.

  1. Stop the engine, and wait until the engine coolant cools down to ambient temperature.

    CAUTION:
    Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.



    A151850E04
  1. Check that the coolant level is between the FULL and LOW lines. If the coolant level is below the LOW line, repeat all of the procedures above. If the coolant level is above the FULL line, drain coolant so that the coolant level is between the FULL and LOW lines.



14. INSPECT FOR COOLANT LEAK

CAUTION:
Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.



    A162054
  1. Fill the radiator with coolant and attach a radiator cap tester.

  1. Warm up the engine.

  1. Using the radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf/cm2, 17 psi), and check that the pressure does not drop. If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and head.



15. INSPECT FOR FUEL LEAK
  1. Connect the Techstream to the DLC3.

  1. Turn the ignition switch to ON and Techstream main switch ON.

    NOTICE:
    Do not start the engine.

  1. Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump / Speed.

  1. Check that there are no fuel leaks after doing maintenance anywhere on the fuel system.



16. INSTALL NO. 1 ENGINE UNDER COVER


    A150108
  1. Hook the engine under cover onto the vehicle body as shown in the illustration.

  1. Install the 3 screws and 5 bolts.

    Torque:
    for bolt:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }
    for screw:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }



17. INSTALL THROTTLE BODY COVER SUB-ASSEMBLY


    A156184E02
  1. Install the 2 throttle body cover brackets with the 2 bolts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



    A156183E01
  1. Install the throttle body cover with the 2 cap nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }



18. INSTALL FRONT COWL TOP OUTER PANEL SUB-ASSEMBLY


  1. Install the outer panel with the 7 bolts.


    A151796

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

  1. Connect the 2 washer hoses.



19. INSTALL FRONT WIPER MOTOR AND LINK
  1. For the front wiper motor and link, refer to the following procedures (Click here).