Home › ENGINE · 3UR-FBE › ENGINE CONTROL SYSTEM › SFI SYSTEM

SFI SYSTEM > Cranking Holding Function Circuit

for Preparation Click here


DESCRIPTION

The cranking holding control system provides current to the starter when the ECM detects the ignition switch's start signal (STSW). When the ECM performs a firing judgment, the system cuts current to the starter. When an ECM receives the STSW signal, it turns on the ACC Cut relay, which prevents flickering of the combination meter, clock, audio system, etc. Also, the ECM sends a signal to the ECM's STAR terminal. Then the STAR output signal travels through the Park / Neutral Position (PNP) switch to the STARTER relay, causing the starter to activate.
When the engine is cranking, the starter operation signal is sent to the ECM's STA terminal.

A103821E74


WIRING DIAGRAM


A161886E04


INSPECTION PROCEDURE

1.CHECK CRANKING
  1. Check the cranking of the engine.

    Result 
    Test Result
    Proceed to
    Cranking possible and holding control operates
    A
    Does not crank
    B
    Cranking possible but holding control does not operate
    C



B
Go to step 2

C
Go to step 11
A

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE (Click here)  

2.READ VALUE USING TECHSTREAM (STARTER SIGNAL)
  1. Connect the Techstream to the DLC3.

  1. Turn the ignition switch to ON.

  1. Turn the Techstream ON.

  1. Enter the following menus: Powertrain / Engine and ECT / Data List / Starter Signal.

  1. Read values.

  1. Check the result when the ignition switch is turned to ON and when the engine is started.

    Standard:

    Ignition Switch Position
    Display (Starter Signal)
    ON
    Close
    START
    Open



NG
Go to step 7
OK


3.INSPECT STARTER RELAY (ST)


    B016200E02
  1. Remove the starter relay (ST) from the engine room relay block (Click here).

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Condition
    Specified Condition
    3 - 5
    When no battery voltage applied to terminals 1 and 2
    10 kΩ or higher
    3 - 5
    When battery voltage applied to terminals 1 and 2
    Below 1 Ω



NG
REPLACE STARTER RELAY (ST) (Click here)
OK


4.CHECK HARNESS AND CONNECTOR (ST RELAY - PNP SWITCH)
  1. Remove the starter relay (ST) from the engine room relay block (Click here).

  1. Disconnect the D35 PNP switch.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:

    Tester Connection
    Condition
    Specified Condition
    ST relay (1) - D35-5
    Always
    Below 1 Ω
    ST relay (1) or D35-5 - Body ground
    Always
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


5.CHECK STARTER RELAY (POWER SOURCE)
A162331E01
  1. Remove the ST relay from the engine room relay block (Click here).

  1. Measure the voltage according to the value(s) in the table below.

    Standard voltage:
    Tester Connection
    Condition
    Specified Condition
    ST relay (2) - ST relay (5)
    Always
    11 to 14 V



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (STARTER RELAY (ST) - BATTERY, BODY GROUND)
OK


6.INSPECT STARTER
  1. Inspect the starter (Click here).



NG
REPAIR OR REPLACE STARTER (Click here)
OK

REPAIR OR REPLACE HARNESS OR CONNECTOR (STARTER - STARTER RELAY (ST), BATTERY) 

7.CHECK IGNITION SWITCH (POWER SOURCE)
A163734E01
  1. Disconnect the J9 ignition switch connector.

  1. Measure the voltage according to the value(s) in the table below.

    Standard voltage:
    Tester Connection
    Condition
    Specified Condition
    J9-5 (AM2) - Body ground
    Always
    11 to 14 V



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (IGNITION SWITCH - BATTERY POSITIVE TERMINAL)
OK


8.INSPECT IGNITION SWITCH
  1. Inspect the ignition switch (Click here).



NG
REPLACE IGNITION SWITCH (Click here)
OK


9.INSPECT PARK / NEUTRAL POSITION SWITCH (POWER SOURCE)
C159064E02
  1. Disconnect the D35 PNP switch connector.

  1. Measure the voltage according to the value(s) in the table below.

    Standard voltage:
    Tester Connection
    Condition
    Specified Condition
    D35-4 - Body ground
    While cranking the engine
    11 to 14 V



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (PNP SWITCH - IGNITION SWITCH)
OK


10.INSPECT PARK / NEUTRAL POSITION SWITCH
C160109E01
  1. Disconnect the D35 PNP switch connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Switch Condition
    Specified Condition
    4 (B) - 5 (L)
    Shift lever position P
    Below 1 Ω
    Shift lever position N
    Below 1 Ω

    Result 
    Result
    Proceed to
    OK
    A
    NG
    B



B
REPLACE PARK / NEUTRAL POSITION SWITCH ASSEMBLY (Click here)
A

REPAIR OR REPLACE HARNESS OR CONNECTOR (PNP SWITCH - ECM) 

11.CHECK HARNESS AND CONNECTOR (IGNITION SWITCH - ECM)
  1. Disconnect the J9 ignition switch connector.

  1. Disconnect the A24 ECM connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:

    Tester Connection
    Condition
    Specified Condition
    J9-7 (ST2) - A24-14 (STSW)
    Always
    Below 1 Ω
    J9-7 (ST2) or A24-14 (STSW) - Body ground
    Always
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


12.CHECK HARNESS AND CONNECTOR (PNP SWITCH - ECM)
  1. Disconnect the D35 PNP switch connector.

  1. Disconnect the D74 ECM connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:

    Tester Connection
    Condition
    Specified Condition
    D35-4 - D74-16 (STAR)
    Always
    Below 1 Ω
    D35-4 or D74-16 (STAR) - Body ground
    Always
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

REPLACE ECM (Click here)