Home › ENGINE ยท 3UR-FBE › EMISSION CONTROL › AIR SWITCHING VALVE

AIR SWITCHING VALVE > INSTALLATION

for Preparation Click here



1. INSTALL NO. 3 AIR TUBE


    A158585E01
  1. Install a new gasket and the No. 3 air tube with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    NOTICE:
    Make sure the gasket's claws are not caught between the air tube and air switching valve.

    HINT:
    The identification color on the flange is orange.



2. INSTALL NO. 2 AIR TUBE


    A158584E01
  1. Install a new gasket and the No. 2 air tube with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    NOTICE:
    Make sure the gasket's claws are not caught between the air tube and air switching valve.

    HINT:
    The identification color on the flange is blue.



3. INSTALL AIR SWITCHING VALVE ASSEMBLY


    A158586
  1. Install the air switching valve with the 3 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the 2 air switching valve connectors.



    A158583
  1. Install the bracket with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Connect the knock sensor connector.



4. INSTALL AIR TUBE
  1. Connect the 2 No. 1 air hoses to the air tube.



    A158582
  1. Connect the air tube to the air switching valve, and install the air tube with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



    A158575E02
  1. Connect the air pump connector clamp's holder.

  1. Attach the wire harness claw.

  1. Connect the air pump connector.

  1. Connect the No. 2 and No. 3 hose.



5. INSTALL FRONT WATER BY-PASS JOINT


    A158579
  1. Install 2 new gaskets and the front water by-pass joint with the 4 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the engine coolant temperature sensor connector.



6. CONNECT NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY (w/ Trailer Towing System)


    A158578
  1. Connect the No. 2 water by-pass pipe with the 3 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



7. CONNECT NO. 2 WATER BY-PASS HOSE


    A158577E02
  1. Connect the No. 2 water by-pass hose to the water by-pass joint.



8. CONNECT NO. 1 WATER BY-PASS HOSE
  1. Connect the No. 1 water by-pass hose to the water by-pass joint and water inlet housing.



9. INSTALL NO. 1 ENGINE COVER


A158656

NOTICE:
Make sure that the No. 1 engine cover is level with the top surface of the intake port of the cylinder head for 1 and 2.

HINT:
  1. Align the No. 1 engine cover cutouts with the air tube.
  2. Align the No. 1 engine cover with the air switching valve surface and cylinder head wall.



10. CONNECT FUEL TUBE CLAMP


    A158580
  1. Connect the fuel tube clamp to the bracket.



11. INSTALL NO. 2 ENGINE COVER


A158538

NOTICE:
Make sure that the No. 2 engine cover is level with the top surface of the intake port if the cylinder head.

HINT:
  1. Align the No. 2 engine cover cutout with the air tube.
  2. Align the No. 2 engine cover with the front water by-pass joint and cylinder head wall.



12. INSTALL FAN SHROUD
  1. Install the fan shroud (Click here).



13. INSTALL INTAKE MANIFOLD
  1. Install the intake manifold (Click here).



14. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY
  1. Install the exhaust manifold (Click here).