SFI SYSTEM > Cranking Holding Function Circuit |


| 1.READ VALUE USING TECHSTREAM (STARTER SIGNAL) |
Connect the Techstream to the DLC3.
Turn the ignition switch to ON.
Turn the Techstream on.
Enter the following menus: Powertrain / Engine and ECT / Data List / Starter Signal.
Check the result when the ignition switch is turned to the ON and START positions.
| Ignition Switch Condition | Starter Signal |
| ON | OFF |
| START | ON |
|
| ||||
| OK | ||
| ||
| 2.INSPECT ECM (STSW TERMINAL VOLTAGE) |
![]() |
Disconnect the ECM connector.
Perform the cranking operation.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Ignition Switch Condition | Specified Condition |
| A24-14 (STSW) - Body ground | ON | Below 1 V |
| START | 9 to 13 V |
|
| ||||
| OK | |
| 3.INSPECT ECM (STAR TERMINAL OUTPUT VOLTAGE) |
![]() |
Connect the Techstream to the DLC3.
Turn the ignition switch to ON.
Turn the Techstream on.
Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the All Cylinders Fuel Cut.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
| D73-6 (Junction Connector) - Body ground | Ignition switch ON (shift lever in P or N) | Below 1 V |
| Ignition switch ON (shift lever not in P or N) | 9 to 13 V | |
| Cranking operation | 9 to 13 V |
|
| ||||
| OK | |
| 4.INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY |
Inspect Park/Neutral Position (PNP) switch assembly.
|
| ||||
| OK | |
| 5.CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH ASSEMBLY - ECM) |
![]() |
Disconnect the park/neutral position (PNP) switch assembly connector.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| D35-4 (B) - D74-16 (STAR) | Always | Below 1 Ω |
| D35-4 (B) - D74-120 (NSW) | Always | Below 1 Ω |
|
| ||||
| OK | |
| 6.CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH ASSEMBLY - ECM - ST RELAY) |
![]() |
Remove the ST relay from the engine room relay block.
Disconnect the park/neutral position (PNP) switch assembly switch connector.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| D35-5 (L) - A24-46 (STA) | Always | Below 1 Ω |
| D35-5 (L) - ST relay (1) | Always | Below 1 Ω |
| ST relay (2) - Body ground | Always | Below 1 Ω |
|
| ||||
| OK | ||
| ||
| 7.INSPECT IGNITION SWITCH ASSEMBLY |
Inspect the ignition switch assembly (Click here).
|
| ||||
| OK | ||
| ||
| 8.INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY |
Inspect Park/Neutral Position (PNP) switch assembly.
|
| ||||
| OK | |
| 9.CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH ASSEMBLY - IGNITION SWITCH ASSEMBLY AND ECM) |
![]() |
Disconnect the ignition switch assembly connector.
Disconnect the Park/Neutral Position (PNP) switch assembly connector.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| J9-7 (ST2) - D35-4 (B) | Always | Below 1 Ω |
| D74-16 (STAR) - D35-4 (B) | Always | |
| D74-120 (NSW) - D35-4 (B) | Always | |
| J9-7 (ST2) or D35-4 (B) - Body ground | Always | 10 kΩ or higher |
| D74-16 (STAR) or D35-4 (B) - Body ground | Always | |
| D74-120 (NSW) or D35-4 (B) - Body ground | Always |
|
| ||||
| OK | |
| 10.CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH ASSEMBLY - ECM - ST RELAY) |
![]() |
Remove the ST relay from the engine room relay block.
Disconnect the Park/Neutral Position (PNP) switch assembly connector.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| D35-5 (L) or A24-46 (STA) - Body ground | Always | 10 kΩ or higher |
| D35-5 (L) or ST relay (1) - Body ground | Always | 10 kΩ or higher |
|
| ||||
| OK | ||
| ||