Home › HEATER & AIR CONDITIONING SYSTEM › AIR CONDITIONING › AIR CONDITIONING PANEL

AIR CONDITIONING PANEL > INSTALLATION

for Preparation Click here



1. INSTALL AIR CONDITIONING CONTROL ASSEMBLY


    E281401E01
  1. Attach the 3 clips to install the air conditioning control assembly to the center lower instrument panel finish panel.
    Text in Illustration 
    *1
    Air Conditioning Control Assembly
    *2
    Center Lower Instrument Panel Finish Panel



  1. Put protective tape around the air conditioning control assembly.


    E281400E01


    Text in Illustration 
    *A
    for Automatic Air Conditioning System
    *B
    for Manual Air Conditioning System
    *1
    Protective Tape
    *2
    Air Conditioning Control Assembly
    *3
    Center Lower Instrument Panel Finish Panel
    -
    -

  1. Connect each connector.

  1. Attach the 8 clips, 2 claws and guide to install the air conditioning control assembly together with the center lower instrument panel finish panel.



2. INSTALL FRONT CONSOLE BOX (for Floor Shift Type)
(Click here)


3. INSTALL CENTER LOWER INSTRUMENT COVER (for Column Shift Type)
  1. Attach the 2 guides and 2 clips to install the lower center instrument cover.

  1. Install the 2 clips.