Home › ENGINE ยท 1UR-FE › EMISSION CONTROL › PCV VALVE

PCV VALVE > INSTALLATION

for Preparation Click here



1. INSTALL PCV VALVE SUB-ASSEMBLY


    A309478E01
  1. Apply a light coat of engine oil to the O-ring.
    Text in Illustration 
    *1
    O-Ring

    HINT:
    1. When reusing the PCV valve sub-assembly, inspect the O-ring.
    2. If the O-ring has scratches or cuts, replace the PCV valve sub-assembly.

  1. Install the PCV valve sub-assembly.

    Torque:
    3.5 N*m{ 36 kgf*cm , 31 in.*lbf }



2. CONNECT PCV VALVE HOSE
  1. Connect the PCV valve hose to the PCV valve sub-assembly, and slide the clamp to secure the hose.



3. INSTALL NO. 3 ENGINE COVER


    A309475
  1. Install the No. 3 engine cover.



4. INSTALL NO. 4 ENGINE COVER


    A214270
  1. Install the No. 4 engine cover.



5. INSTALL INTAKE MANIFOLD
(Click here)