ENGINE UNIT > INSTALLATION |
| 1. INSTALL IGNITION COIL ASSEMBLY |
Install the 8 ignition coils with the 8 bolts.
| 2. INSTALL KNOCK SENSOR |
![]() |
Install the 4 knock sensors with the 4 bolts so that the knock sensors are angled as shown in the illustration.
| *a | Bank 2 Sensor 1 |
| *b | Bank 1 Sensor 1 |
| *c | Bank 2 Sensor 2 |
| *d | Bank 1 Sensor 2 |
| *e | Front |
| *f | Upper |
| *g | Rear |
Connect the 4 knock sensor connectors.
| 3. INSTALL SEPARATOR CASE |
Install the separator case with the 4 bolts.
| 4. INSTALL ENGINE WIRE |
Connect the 3 clamps and 4 knock sensor connectors.
| 5. INSTALL NO. 3 AIR TUBE |
![]() |
Install a new gasket and the No. 3 air tube with the 2 bolts.
| *1 | Identification Color |
| 6. INSTALL NO. 2 AIR TUBE |
![]() |
Install a new gasket and the No. 2 air tube with the 2 bolts.
| *1 | Identification Color |
| 7. INSTALL AIR SWITCHING VALVE ASSEMBLY |
Install the air switching valve assembly with the 3 bolts to the No. 1 heat exchanger cover.
Connect the 2 air switching valve assembly connectors.
Install the bracket to the air switching valve assembly with the bolt.
Connect the knock sensor connector.
| 8. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY |
Connect the No. 2 water by-pass hose and No. 3 water by-pass hose to the water by-pass pipe sub-assembly, and slide the 2 clamps to secure the hoses.
Install the water by-pass pipe sub-assembly with the 2 bolts.
Connect the air tube sub-assembly with the bolt.
| 9. INSTALL WATER INLET HOUSING |
![]() |
Install a new gasket to the timing chain cover sub-assembly.
| *1 | Gasket |
Install the water inlet housing with the 3 bolts.
| 10. INSTALL AIR TUBE |
Connect the 2 hoses.
Install the air tube sub-assembly with the bolt.
| 11. INSTALL OIL PRESSURE SENDER GAUGE ASSEMBLY |
![]() |
Apply adhesive to 2 or 3 threads of the oil pressure sender gauge.
![]() |
Install the oil pressure sender gauge.
![]() |
Connect the sender gauge connector.
| 12. INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY |
Install the No. 1 idler pulley sub-assembly with the bolt.
| 13. INSTALL WATER PUMP PULLEY |
Temporarily install the water pump pulley with the 4 bolts.
Using SST, hold the water pump pulley and tighten the 4 bolts.
| 14. INSTALL NO. 1 ENGINE COVER |
![]() |
| 15. INSTALL NO. 2 ENGINE COVER |
![]() |
| 16. INSTALL FRONT WATER BY-PASS JOINT |
Install 2 new gaskets and the front water by-pass joint with the 4 nuts to the cylinder head.
Connect the No. 2 water by-pass hose to the front water by-pass joint, and slide the clamp to secure the hose.
| 17. INSTALL NO. 1 WATER BY-PASS HOSE |
Connect the No. 1 water by-pass hose to the inlet water housing and front water by-pass joint, and slide the 2 clamps to secure the hoses.
| 18. INSTALL NO. 2 WATER BY-PASS PIPE (w/ Oil Cooler) |
Connect the 4 hoses to the No. 2 water by-pass pipe, and slide the 4 clamps to secure the hoses.
Install the No. 2 water by-pass pipe with the 3 bolts.
| 19. INSTALL FUEL TUBE SUB-ASSEMBLY |
![]() |
| 20. INSTALL NO. 2 FUEL TUBE SUB-ASSEMBLY |
![]() |
Install the No. 2 fuel tube with the 2 bolts.
| 21. INSTALL INTAKE MANIFOLD |
![]() |
Place 2 new gaskets on the intake manifold.
Place the intake manifold on the cylinder head sub-assembly.
Install and uniformly tighten the 8 bolts and 2 nuts in several steps.
Install the wire harness clamp bracket to the intake manifold with the bolt.
Attach the 3 wire harness clamps to the 3 wire harness clamp brackets.
Install the No. 1 tube with the 2 bolts.
Connect the union to connector tube hose to the No. 1 tube, and slide the clamp to secure the hose.
Connect the purge line hose to the purge VSV, and slide the clamp to secure the hose.
Connect the 2 vacuum switching valve connectors.
Connect the ventilation hose to the intake manifold, and slide the clamp to secure the hose.
Connect the 2 water by-pass hoses to the inlet water housing and front water by-pass joint, and slide the 2 clamps to secure the hose.
Connect the throttle body connector to the throttle body assembly.
Install the No. 3 engine cover.
Install the No. 1 engine cover sub-assembly.
| 22. INSTALL NO. 1 TUBE |
![]() |
Install the No. 1 tube with the 2 bolts.
| 23. CONNECT VENTILATION HOSE ASSEMBLY |
Connect the ventilation hose assembly to the ventilation pipe of the cylinder head cover sub-assembly and cylinder head cover sub-assembly LH, and slide the 2 clamps to secure the hose.
| 24. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY RH |
![]() |
Install the 2 delivery pipe spacers and 4 insulators to the cylinder head RH.
Install the delivery pipe (with injectors) to the cylinder head RH.
Install the 2 bolts.
![]() |
Install the No. 3 engine cover.
![]() |
Connect the No. 6 wire harness connector.
Connect the ventilation hose.
| 25. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY LH |
![]() |
Install the 2 delivery pipe spacers and 4 insulators to the cylinder head LH.
Install the delivery pipe (with injectors) to the cylinder head LH.
Install the 2 bolts.
![]() |
Connect the No. 7 wire harness connector.
Install the No. 1 engine cover sub-assembly.
| 26. INSTALL NO. 1 ENGINE MOUNTING BRACKET LH |
![]() |
Install the mounting bracket with the 4 bolts.
| 27. INSTALL NO. 1 ENGINE MOUNTING BRACKET RH |
![]() |
Install the mounting bracket with the 4 bolts.
| 28. INSTALL FRONT ENGINE MOUNTING INSULATOR RH |
![]() |
Install the mounting insulator with the nut.
| 29. INSTALL CYLINDER BLOCK WATER DRAIN COCK SUB-ASSEMBLY |
![]() |
Apply adhesive to 2 or 3 threads of the drain cocks.
![]() |
Install the water drain cocks.
Further tighten the drain cocks within 360° so that the drain cock pipes are within the range shown in the illustration.
Install the water drain cock plugs to the water drain cocks.
| 30. INSTALL FRONT ENGINE MOUNTING INSULATOR LH |
![]() |
Install the mounting insulator with the nut.
| 31. INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY |
![]() |
Install the No. 1 fuel pipe (Click here).
| 32. INSTALL ENGINE WIRE |
![]() |
Install the engine wire.
Engine Rear Side:
Install the 3 wires with the 3 bolts.
Connect the 5 clamps.
Connect the 3 connectors.
![]() |
Engine RH Side:
Connect the 9 clamps.
Connect the oil pressure sender gauge connector.
Connect the throttle sensor connector.
Connect the fuel injector connector.
Connect the 2 VVT sensor connectors.
Connect the 4 ignition coil connectors.
Connect the 2 camshaft timing control valve connectors.
![]() |
Engine LH Side:
Connect the 8 clamps and install the engine wire with the bolt.
Connect the fuel injector connector.
Connect the engine coolant temperature sensor connector.
Connect the purge VSV connector.
Connect the vacuum switching valve connector (for ACIS).
Connect the camshaft position sensor connector.
Connect the 2 VVT sensor connectors.
Connect the 4 ignition coil connectors.
Connect the 2 camshaft timing control valve connector.