Home › DRIVE LINE › WF1AM TRANSFER › TRANSFER INDICATOR SWITCH

TRANSFER INDICATOR SWITCH > INSTALLATION

for Preparation Click here



1. INSTALL TRANSFER INDICATOR SWITCH
  1. Using SST, install the transfer indicator switch.

    SST
    09224-00010  

    Torque:
    41 N*m{ 413 kgf*cm , 30 ft.*lbf }

    NOTICE:
    Use the formula below to calculate special torque values for situations where SST is combined with a torque wrench (Click here).

  1. Connect the connector and attach the clamp.



2. INSTALL FRONT NO. 2 EXHAUST PIPE ASSEMBLY
  1. for 3UR-FE:
  2. for 1UR-FE:
  3. for 3UR-FBE:


3. INSTALL FRONT PROPELLER SHAFT ASSEMBLY
(Click here)