Home › Engine / Hybrid System › 3UR-FBE EMISSION CONTROL › CANISTER
RM27M0U _51 Engine / Hybrid System _049099 3UR-FBE EMISSION CONTROL _0233979 CANISTER A

3UR-FBE EMISSION CONTROL  CANISTER  INSTALLATION  


PROCEDURE

Hide 77740Q 1.INSTALL CANISTER PUMP MODULE

a.

for 100 L (26.4 US gal) Fuel Tank:

i.
A263356

Engage the 2 claws to install a new canister pump module to the charcoal canister assembly.

NOTICE:
·

Do not allow foreign matter such as grease, oil or water to adhere to the O-rings.

·

Ensure that the claws are engaged properly.





Hide 77740 2.INSTALL CHARCOAL CANISTER ASSEMBLY

a.

for 100 L (26.4 US gal) Fuel Tank:

i.

Install the charcoal canister assembly with the 4 bolts.

Torque:
29 N*m (296 kgf*cm, 21 ft.*lbf)


ii.

Attach the wire harness clamp.


iii.
A273953E01
0.998,2.788 1.181,2.958 0.183,0.170 10 *1 2.121,3.059 2.304,3.229 0.183,0.170 10 *2 2.117,3.154 1.982,3.154 1.982,3.154 1.833,3.368 false

Connect the vent line hose.

Text in Illustration
*1 Vent Line Hose
*2 Retainer
V100136

Push

1.

Push the vent line hose into the port and push the retainer to lock it.

NOTICE:
·

Check for damage or foreign objects on the connected part.

·

After connecting the vent line hose, check that the vent line hose and valve are securely connected by pulling on them.





iv.

Connect the air inlet line hose.

NOTICE:
·

Check for damage or foreign objects on the connected part.

·

After connecting the air inlet line hose, check that the air inlet line hose and valve are securely connected by pulling on them.




v.

Connect the purge line hose.


vi.

Connect the canister pump module connector.


vii.

Connect the wiring harness clamp bracket with the nut.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)



b.

for 144 L (38 US gal) Fuel Tank:

i.

Install the charcoal canister assembly with the 4 bolts.

Torque:
29 N*m (296 kgf*cm, 21 ft.*lbf)


ii.

Attach the wire harness clamp.


iii.
A331182E01
0.943,2.792 1.126,2.962 0.183,0.170 10 *1 2.128,3.023 2.311,3.193 0.183,0.170 10 *2 2.117,3.118 1.982,3.118 1.982,3.118 1.833,3.332 false

Connect the vent line hose.

Text in Illustration
*1 Vent Line Hose
*2 Retainer
V100136

Push

1.

Push the vent line hose into the port and push the retainer to lock it.

NOTICE:
·

Check for damage or foreign objects on the connected part.

·

After connecting the vent line hose, check that the vent line hose and valve are securely connected by pulling on them.





iv.

Connect the air inlet line hose.

NOTICE:
·

Check for damage or foreign objects on the connected part.

·

After connecting the air inlet line hose, check that the air inlet line hose and valve are securely connected by pulling on them.




v.

Connect the purge line hose.


vi.

Connect the canister pump module connector.


vii.

Connect the wiring harness clamp bracket with the nut.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)