Home › Engine / Hybrid System › 3UR-FBE EMISSION CONTROL › CANISTER
RM27M0U _51 Engine / Hybrid System _049099 3UR-FBE EMISSION CONTROL _0233979 CANISTER G

3UR-FBE EMISSION CONTROL  CANISTER  INSPECTION  


PROCEDURE

Hide 77740 1.INSPECT CHARCOAL CANISTER ASSEMBLY

a.

for 100 L (26.4 US gal) Fuel Tank:

i.
A263351

Visually check the charcoal canister assembly for cracks or damage.

If cracks or damage are found, replace the charcoal canister assembly.


ii.

Check charcoal canister assembly operation.

1.
A263352E01
1.065,1.833 1.222,1.989 0.157,0.155 10 *a 2.399,1.644 2.563,1.801 0.164,0.157 10 *d 2.453,0.154 2.635,0.318 0.182,0.164 10 *c 3.168,1.114 3.338,1.278 0.169,0.164 10 *b 1.764,1.615 1.479,1.938 1.479,1.938 1.261,1.938 false 2.157,1.164 2.264,0.256 2.264,0.256 2.441,0.256 false 3.155,1.207 3.035,1.207 3.035,1.207 2.943,1.459 false

With the purge port closed, blow 5 kPa (0.1 kgf/cm2, 0.7 psi) of air into the vent line port, and check that air flows from the air inlet line port.

Text in Illustration
*a Vent Line Port
*b Air Inlet Line Port
*c Purge Line Port
*d Air

If the result is not as specified, replace the charcoal canister assembly.

2.
A263353E03
1.479,1.469 0.406,1.469 false 3.052,1.229 2.927,1.229 2.927,1.229 2.76,1.479 false 1.875,1.802 1.875,1.625 1.875,1.625 2.042,1.229 false 0.208,1.365 0.385,1.521 0.177,0.156 10 false *a 1.792,1.792 1.969,1.958 0.177,0.167 10 false *c 3.073,1.146 3.25,1.302 0.177,0.156 10 false *b 3.198,1.781 3.365,1.938 0.167,0.156 10 false *d

With the vent port closed, blow 5 kPa (0.1 kgf/cm2, 0.7 psi) of air into the air inlet line port, and check that air flows from the purge line port.

Text in Illustration
*a Vent Line Port
*b Air Inlet Line Port
*c Purge Line Port
*d Air

If the result is not as specified, replace the charcoal canister assembly.



iii.

Check for air leaks.

1.
A263354E01
0.531,1.979 0.692,2.133 0.160,0.155 10 *a 2.382,0.183 2.542,0.338 0.160,0.155 10 *c 2.275,1.657 2.436,1.811 0.160,0.155 10 *b 2.731,2.127 2.891,2.282 0.160,0.155 10 *1 0.727,2.088 0.988,2.088 0.988,2.088 1.559,1.513 false 2.723,2.222 2.579,2.222 2.579,2.222 2.386,2.355 false 2.108,1.131 2.213,0.286 2.213,0.286 2.366,0.286 false 2.467,1.754 2.58,1.754 2.58,1.754 2.706,1.521 false

Connect a pressure gauge to the vent line port of the charcoal canister assembly.

Text in Illustration
*1 Pressure Gauge
*a Vent Line Port
*b Air Inlet Line Port
*c Purge Line Port

2.

With the purge line port and air inlet line port closed, apply 20 kPa (150 mmHg, 5.91 in.Hg) of pressurized air into the vent line port, and then confirm that pressure is retained for 1 minute.

If the result is not as specified, replace the charcoal canister assembly.



iv.

Check the canister pump module.

1.
A263355

Connect a positive (+) lead from the battery to terminal 5 and a negative (-) lead to terminal 1.

2.

Check that a clicking sound is heard from the canister pump module.

If the result is not as specified, replace the canister pump module.




b.

for 144 L (38 US gal) Fuel Tank:

i.
A331176

Visually check the charcoal canister assembly for cracks or damage.

If cracks or damage are found, replace the charcoal canister assembly.


ii.

Check charcoal canister assembly operation.

1.
A331177E01
1.14,1.929 1.297,2.085 0.157,0.155 10 *a 2.486,1.79 2.697,1.947 0.210,0.157 10 *d 2.775,0.14 2.976,0.327 0.201,0.187 10 *c 3.127,1.205 3.297,1.369 0.169,0.164 10 *b 1.838,1.711 1.554,2.034 1.554,2.034 1.336,2.034 false 2.221,1.3 2.587,0.242 2.587,0.242 2.763,0.242 false 3.114,1.298 2.994,1.298 2.994,1.298 2.902,1.549 false

With the purge port closed, blow 5 kPa (0.1 kgf/cm2, 0.7 psi) of air into the vent line port, and check that air flows from the air inlet line port.

Text in Illustration
*a Vent Line Port
*b Air Inlet Line Port
*c Purge Line Port
*d Air

If the result is not as specified, replace the charcoal canister assembly.

2.
A331178E01
0.314,1.453 0.488,1.608 0.173,0.154 10 *a 1.824,1.881 2.005,2.046 0.181,0.165 10 *c 3.057,1.241 3.230,1.402 0.173,0.160 10 *b 3.227,1.62 3.398,1.776 0.171,0.156 10 *d 1.58,1.553 0.518,1.553 false 3.039,1.333 2.912,1.333 2.912,1.333 2.777,1.546 false 1.933,1.877 1.933,1.703 1.933,1.703 2.093,1.306 false

With the vent port closed, blow 5 kPa (0.1 kgf/cm2, 0.7 psi) of air into the air inlet line port, and check that air flows from the purge line port.

Text in Illustration
*a Vent Line Port
*b Air Inlet Line Port
*c Purge Line Port
*d Air

If the result is not as specified, replace the charcoal canister assembly.



iii.

Check for air leaks.

1.
A331179E01
0.526,2.13 0.686,2.285 0.160,0.155 10 *a 2.605,0.159 2.766,0.313 0.160,0.155 10 *c 2.177,1.809 2.337,1.963 0.160,0.155 10 *b 2.688,2.167 2.848,2.322 0.160,0.155 10 *1 0.721,2.24 0.983,2.24 0.983,2.24 1.554,1.665 false 2.68,2.262 2.536,2.262 2.536,2.262 2.343,2.395 false 2.073,1.344 2.436,0.262 2.436,0.262 2.59,0.262 false 2.368,1.906 2.481,1.906 2.481,1.906 2.607,1.672 false

Connect a pressure gauge to the vent line port of the charcoal canister assembly.

Text in Illustration
*1 Pressure Gauge
*a Vent Line Port
*b Air Inlet Line Port
*c Purge Line Port

2.

With the purge line port and air inlet line port closed, apply 20 kPa (150 mmHg, 5.91 in.Hg) of pressurized air into the vent line port, and then confirm that pressure is retained for 1 minute.

If the result is not as specified, replace the charcoal canister assembly.



iv.

Check the canister pump module.

1.
A331180

Connect a positive (+) lead from the battery to terminal 5 and a negative (-) lead to terminal 1.

2.

Check that a clicking sound is heard from the canister pump module.

If the result is not as specified, replace the charcoal canister assembly.