Home › Engine / Hybrid System › 1UR-FE EMISSION CONTROL › CANISTER
RM27M0U _51 Engine / Hybrid System _049101 1UR-FE EMISSION CONTROL _0233992 CANISTER G

1UR-FE EMISSION CONTROL  CANISTER  INSPECTION  


PROCEDURE

Hide 77740 1.INSPECT CHARCOAL CANISTER ASSEMBLY

a.
A263351

Visually check the charcoal canister assembly for cracks or damage.

If cracks or damage are found, replace the charcoal canister assembly.


b.

Check charcoal canister assembly operation.

i.
A263352E01
1.065,1.833 1.222,1.989 0.157,0.155 10 *a 2.399,1.644 2.563,1.801 0.164,0.157 10 *d 2.453,0.154 2.635,0.318 0.182,0.164 10 *c 3.168,1.114 3.338,1.278 0.169,0.164 10 *b 1.764,1.615 1.479,1.938 1.479,1.938 1.261,1.938 false 2.157,1.164 2.264,0.256 2.264,0.256 2.441,0.256 false 3.155,1.207 3.035,1.207 3.035,1.207 2.943,1.459 false

With the purge port closed, blow 5 kPa (0.1 kgf/cm2, 0.7 psi) of air into the vent line port, and check that air flows from the air inlet line port.

Text in Illustration
*a Vent Line Port
*b Air Inlet Line Port
*c Purge Line Port
*d Air

If the result is not as specified, replace the charcoal canister assembly.


ii.
A263353E01
0.208,1.365 0.381,1.519 0.173,0.154 10 *a 1.789,1.792 1.971,1.957 0.181,0.165 10 *c 3.071,1.144 3.244,1.304 0.173,0.160 10 *b 3.198,1.778 3.369,1.934 0.171,0.156 10 *d 1.474,1.464 0.411,1.464 false 3.053,1.234 2.926,1.234 2.926,1.234 2.791,1.447 false 1.899,1.789 1.899,1.614 1.899,1.614 2.058,1.217 false

With the vent port closed, blow 5 kPa (0.1 kgf/cm2, 0.7 psi) of air into the air inlet line port, and check that air flows from the purge line port.

Text in Illustration
*a Vent Line Port
*b Air Inlet Line Port
*c Purge Line Port
*d Air

If the result is not as specified, replace the charcoal canister assembly.



c.

Check for air leaks.

i.
A263354E01
0.531,1.979 0.692,2.133 0.160,0.155 10 *a 2.382,0.183 2.542,0.338 0.160,0.155 10 *c 2.275,1.657 2.436,1.811 0.160,0.155 10 *b 2.731,2.127 2.891,2.282 0.160,0.155 10 *1 0.727,2.088 0.988,2.088 0.988,2.088 1.559,1.513 false 2.723,2.222 2.579,2.222 2.579,2.222 2.386,2.355 false 2.108,1.131 2.213,0.286 2.213,0.286 2.366,0.286 false 2.467,1.754 2.58,1.754 2.58,1.754 2.706,1.521 false

Connect a pressure gauge to the vent line port of the charcoal canister assembly.

Text in Illustration
*1 Pressure Gauge
*a Vent Line Port
*b Air Inlet Line Port
*c Purge Line Port


ii.

With the purge line port and air inlet line port closed, apply 20 kPa (150 mmHg, 5.91 in.Hg) of pressurized air into the vent line port, and then confirm that pressure is retained for 1 minute.

If the result is not as specified, replace the charcoal canister assembly.



d.

Check the canister pump module.

i.
A263355

Connect a positive (+) lead from the battery to terminal 5 and a negative (-) lead to terminal 1.


ii.

Check that a clicking sound is heard from the canister pump module.

If the result is not as specified, replace the canister pump module.