Home › Drivetrain › PROPELLER SHAFT › PROPELLER SHAFT ASSEMBLY(for 2WD)
RM27M0U _52 Drivetrain _049149 PROPELLER SHAFT _0234382 PROPELLER SHAFT ASSEMBLY(for 2WD) G

PROPELLER SHAFT  PROPELLER SHAFT ASSEMBLY(for 2WD)  INSPECTION  


CAUTION / NOTICE / HINT

PROCEDURE

Hide 37100 1.INSPECT PROPELLER SHAFT WITH CENTER BEARING ASSEMBLY

a.
C160082

Using a dial indicator, measure the intermediate shaft runout.

Maximum runout:

0.61 mm (0.0240 in.)


If the intermediate shaft runout is more than the maximum, replace the propeller shaft with center bearing assembly.


b.
C160083

Using a dial indicator, measure the propeller shaft runout.

Maximum runout:

1.02 mm (0.0402 in.)


If the propeller shaft runout is more than the maximum, replace the propeller shaft with center bearing assembly.


Hide 37401E 2.INSPECT PROPELLER SHAFT UNIVERSAL JOINT SPIDER BEARING

a.
C134366

Mount the propeller shaft in a vise.

NOTICE:

Be careful not to grip the propeller shaft tube too tightly in a vise as this will cause deformation.



b.

Inspect the spider bearing for wear or damage.


c.

Using a dial indicator, measure the spider bearing axial play by turning the yoke of the flange while holding the shaft tightly.

Maximum bearing axial play:

0.05 mm (0.00197 in.)


If the spider bearing axial play is more than the maximum, replace the spider bearing.


Hide 37230 3.INSPECT NO. 1 CENTER SUPPORT BEARING ASSEMBLY

a.
C134367

Check that the bearing turns freely.

If the bearing is damaged, worn, or does not turn freely, replace it.