Home › Drivetrain › PROPELLER SHAFT › FRONT PROPELLER SHAFT ASSEMBLY
RM27M0U _52 Drivetrain _049149 PROPELLER SHAFT _0234384 FRONT PROPELLER SHAFT ASSEMBLY G

PROPELLER SHAFT  FRONT PROPELLER SHAFT ASSEMBLY  INSPECTION  


PROCEDURE

Hide 37140 1.INSPECT FRONT PROPELLER SHAFT ASSEMBLY

C158559

a.

Check that the propeller shaft is not damaged or deformed.

If necessary, replace the propeller shaft.



b.

Using a dial indicator, check the propeller shaft runout.

Maximum runout:

0.61 mm (0.0240 in.)



Hide 04371G 2.INSPECT UNIVERSAL JOINT SPIDER BEARING

a.

Check that the joints move smoothly.


b.

Check the spider bearings for wear and damage.


c.

Check the spider bearing axial play by turning the yoke while holding the shaft tightly.

Maximum bearing axial play:

0.05 mm (0.00197 in.)


If necessary, replace the spider bearing.