Home › Suspension › SUSPENSION › FRONT UPPER SUSPENSION ARM
RM27M0U _53 Suspension _049152 SUSPENSION _0234396 FRONT UPPER SUSPENSION ARM G

SUSPENSION  FRONT UPPER SUSPENSION ARM  INSPECTION  


PROCEDURE

Hide 48630 1.INSPECT FRONT SUSPENSION UPPER ARM ASSEMBLY LH

G020170

a.

As shown in the illustration, flip the ball joint stud back and forth 5 times, before installing the nut.


b.

Using a torque wrench, turn the nut continuously at a rate of 3 to 5 seconds per 1 turn and take the torque reading on the fifth turn.

Standard turning torque:

0.98 to 4.41 N*m (1.0 to 45 kgf*cm, 9 to 39 in.*lbf)