Home › Engine / Hybrid System › 1NZ-FE EMISSION CONTROL › PURGE VALVE › 2011.08–2015.06
RM19S0E _51 Engine / Hybrid System _051454 1NZ-FE EMISSION CONTROL _0248102 PURGE VALVE A

1NZ-FE EMISSION CONTROL  PURGE VALVE  INSTALLATION  


PROCEDURE

Hide 25860 1.INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY

a.

Install the No. 1 vacuum switching valve assembly.


b.

Engage the wire harness clamp and connect the No. 1 vacuum switching valve assembly connector.


c.

Connect the No. 2 fuel vapor feed hose.


d.

Connect the fuel vapor feed hose assembly.