Home › Engine / Hybrid System › 2NZ-FE EMISSION CONTROL › PURGE VALVE › from 2015.06
RM19S0E _51 Engine / Hybrid System _051455 2NZ-FE EMISSION CONTROL _0248106 PURGE VALVE A

2NZ-FE EMISSION CONTROL  PURGE VALVE  INSTALLATION  


PROCEDURE

Hide 25860 1.INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY

a.

Insert the No. 1 vacuum switching valve assembly into the No. 1 air cleaner hose to install it.


b.

Engage the clamp to connect the wire harness to the No. 1 vacuum switching valve assembly.


c.

Connect the purge No. 1 vacuum switching valve assembly connector.


d.

Connect the No. 2 fuel vapor feed hose to the No. 1 vacuum switching valve assembly.


e.

Connect the fuel vapor feed hose assembly to the No. 1 vacuum switching valve assembly and slide the hose clip to secure it.