Home › Power Source / Network › 1NZ-FE BATTERY / CHARGING › GENERATOR › 2011.08–2014.07
RM19S0E _57 Power Source / Network _051486 1NZ-FE BATTERY / CHARGING _0248281 GENERATOR A

1NZ-FE BATTERY / CHARGING  GENERATOR  REASSEMBLY  


PROCEDURE

Hide 27330 1.INSTALL GENERATOR ROTOR ASSEMBLY

A033351

a.

Place the generator rotor assembly on the generator drive end frame assembly.


b.

Using a plastic hammer, install the generator rotor assembly to the generator drive end frame assembly.


c.
A247898

Install a new generator washer on the generator rotor assembly.


d.
A182592E01
2.374,0.094 2.530,0.276 0.156,0.181 10 *1 1.933,0.287 2.364,0.22 false

Using a 30 mm/12 pt socket wrench and press, slowly press in the generator rectifier end frame.

Text in Illustration
*1 30 mm/12 pt Socket Wrench


e.
A183136E03
1.865,3 2,2.885 false 1.594,1.167 2.229,0.583 2.229,0.583 1.958,2.333 true 1.438,2.271 2.219,0.594 true 2.188,0.396 2.344,0.573 0.156,0.177 10 false *1 1.708,3 1.865,3.177 0.156,0.177 10 false *2 0.927,0.76 1.083,0.938 0.156,0.177 10 false A 2.719,1.052 2.875,1.229 0.156,0.177 10 false A 2.458,2.688 2.615,2.865 0.156,0.177 10 false B 0.594,2.292 0.75,2.469 0.156,0.177 10 false A

Install the 3 nuts A.

Torque:
4.5 N*m (46 kgf*cm, 40 in.*lbf)


f.

Install the 3 terminal insulators onto the generator rectifier end frame.


g.

Install the cord clip with the nut B.

Torque:
5.4 N*m (55 kgf*cm, 48 in.*lbf)

Text in Illustration
*1 Terminal Insulator
*2 Cord Clip


Hide 27357 2.INSTALL GENERATOR HOLDER WITH RECTIFIER

A219753

a.

Install the generator holder with rectifier with the 3 screws.

Torque:
2.0 N*m (20 kgf*cm, 18 in.*lbf)


Hide 27700A 3.INSTALL GENERATOR REGULATOR ASSEMBLY

A219752

a.

Install the generator regulator assembly with the 2 screws.

Torque:
2.0 N*m (20 kgf*cm, 18 in.*lbf)


Hide 27370 4.INSTALL GENERATOR BRUSH HOLDER ASSEMBLY

A117359E04
2.052,1.865 2.49,1.667 true 2.5,0.875 1.854,0.5 true 2.521,0.313 1.917,0.167 true 1.719,0.073 1.875,0.25 0.156,0.177 10 false *1 1.667,0.385 1.823,0.563 0.156,0.177 10 false *2 1.865,1.823 2.042,2.031 0.177,0.208 10 true *3

a.

Install the generator plate seal.


b.

Install the generator brush holder assembly with the 3 screws.

Torque:
2.0 N*m (20 kgf*cm, 18 in.*lbf)


c.

Install the generator brush cover onto the generator brush holder assembly.

Text in Illustration
*1 Generator Brush Cover
*2 Generator Brush Holder Assembly
*3 Generator Plate Seal


d.
A206812E04
1.823,1.771 1.104,2.021 true 0.917,1.948 1.073,2.125 0.156,0.177 10 false *1 2.302,1.469 2.458,1.688 0.156,0.219 10 true A 2.115,0.5 2.25,0.698 0.135,0.198 10 true B 0.938,0.833 1.115,1.01 0.177,0.177 10 false B

Install the generator rear end cover with the 2 nuts B.

Torque:
Nut B : 4.4 N*m (45 kgf*cm, 39 in.*lbf)


e.

Install the rectifier plate with the nut A and screw.

Torque:
Nut A : 4.4 N*m (45 kgf*cm, 39 in.*lbf)
Screw : 3.9 N*m (40 kgf*cm, 35 in.*lbf)

Text in Illustration
*1 Rectifier Plate


Hide 27387B 5.INSTALL GENERATOR TERMINAL INSULATOR

a.
A219750

Install the generator terminal insulator with the nut.

Torque:
4.1 N*m (42 kgf*cm, 36 in.*lbf)


Hide 27411 6.INSTALL GENERATOR PULLEY

A193553E06
2.802,0.719 2.49,1.208 true 3.052,0.583 3.094,1.531 true 1.219,1.469 1.406,1.646 0.188,0.177 10 true *b 1.813,1.865 2,2.052 0.188,0.188 10 false *a 2.198,1.229 2.771,1.396 0.573,0.167 10 false SST1-B 2.792,1.563 3.333,1.74 0.542,0.177 10 false SST1-A

a.

Clamp the generator housing stay in a vise tightly.


b.

Install the generator pulley onto the generator rotor shaft by tightening the generator pulley nut by hand.


c.

Hold SST1-A with a torque wrench, and tighten SST1-B clockwise to the specified torque.

SST
09820-63011  (09820-06010, 09820-06021)

Torque:
39 N*m (398 kgf*cm, 29 ft.*lbf)

Text in Illustration
*a Hold
*b Turn

NOTICE:

Check that SST is securely fitted onto the generator rotor shaft.



d.
A193554E06
2.51,0.469 2.646,0.885 false 2.104,0.396 2.531,0.615 0.427,0.219 10 false SST2

Insert SST2, and engage SST2 to the pulley nut.


e.
A248835E05
2.927,0.885 1.802,0.583 true 2.479,0.479 1.479,0.208 true 1.281,0.5 1.844,0.656 0.563,0.156 10 false SST1-A 1.094,0.125 1.521,0.354 0.427,0.229 10 false SST2 1.875,3.104 2.031,3.281 0.156,0.177 10 false *b 1.385,2.677 1.688,2.969 0.302,0.292 10 true *a

Tighten the generator pulley nut by turning SST1-A in the direction shown in the illustration.

Text in Illustration
*a Hold
*b Turn

Torque:
137 N*m (1397 kgf*cm, 101 ft.*lbf)

HINT:

Hold the adjustable wrench against the vise and tighten the nut securely.



f.

Remove SST 2 from the generator assembly.


g.
A193556E10
2.823,0.771 2.479,1.167 true 3.052,0.635 3.083,1.542 true 2.188,1.198 2.75,1.344 0.563,0.146 10 false SST1-B 2.802,1.563 3.323,1.75 0.521,0.188 10 false SST1-A 2.01,1.573 2.292,1.802 0.281,0.229 10 true *a 1.375,1.427 1.594,1.615 0.219,0.188 10 true *b

Hold SST1-A, turn SST1-B, and remove SST1-A and SST1-B from the generator assembly.

Text in Illustration
*a Hold
*b Turn


h.

Turn the generator pulley, and check that the generator pulley moves smoothly.


i.

Remove the generator assembly from a vise.