75561
1.INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP
Follow these procedures only when replacing the clips.
Remove the tape that remains on the moulding surface of the vehicle body, and then clean the surface with a non-residue solvent.
Using an infrared light, heat the clip installation surface of the vehicle body and roof drip side finish moulding.
| Area | Temperature |
|---|---|
| Vehicle Body | 40 to 60°C (104 to 140°F) |
| Roof Drip Side Finish Moulding | 20 to 30°C (68 to 86°F) |
Do not burn yourself on the hot body panel or with the infrared light.
Do not excessively heat the vehicle body or roof drip side finish moulding.
Install the 2 new clips in the positions shown in the illustration. Press in the clips by hand.
| Dimension | Measurement |
|---|---|
| a | 3.7 mm (0.146 in.) |
| b | 1.1 to 2.1 mm (0.043 to 0.083 in.) |
| c | 34.3 to 35.3 mm (1.350 to 1.390 in.) |
| d | 4.8 mm (0.189 in.) |
| e | 0.6 to 1.6 mm (0.024 to 0.063 in.) |
| f | 16.5 to 17.5 mm (0.650 to 0.689 in.) |
After pressing in the clips, wait 30 minutes or more before installing the roof drip side finish moulding.
Minimum hardening time: 30 minutes
Time needed for complete hardening: 24 hours
75552
2.INSTALL ROOF DRIP SIDE FINISH MOULDING
Engage the 2 clips and install the roof drip side finish moulding.