When replacing the No. 1 hybrid vehicle supply stack sub-assembly or No. 2 hybrid vehicle supply stack sub-assembly, it is necessary to check, adjust and equalize the SOC of the HV battery. Otherwise, the engine may run longer than normal, resulting in a decrease in fuel efficiency.
Connect the GTS to the DLC3.
Turn the ignition switch on (IG).
Turn the GTS on.
Enter the following menus: Powertrain / HV Battery / Data List / Hybrid Battery SOC.
Read the Data List.
| Tester Display |
|---|
| Hybrid/EV Battery SOC |
| Result | Proceed to |
|---|---|
| "Hybrid Battery SOC" is 55 to 65% | A |
| Other than above | B |
Turn the ignition switch off.
A
B
If the following procedure (charging or discharging of the HV battery) cannot be performed due to the condition of the vehicle, proceed to the next step.
Apply the parking brake and chock all 4 wheels.
Connect the GTS to the DLC3.
Turn the ignition switch on (IG).
Turn the GTS on.
Enter the following menus: Powertrain / HV Battery / Data List / Hybrid Battery SOC.
Depress the accelerator pedal and brake pedal simultaneously or leave the vehicle with neutral (N) selected until the value of Data List item "Hybrid Battery SOC" is between 55% and 65%.
| Tester Display |
|---|
| Hybrid/EV Battery SOC |
Depressing the accelerator pedal and brake pedal simultaneously will cause the HV battery to charge and the value of "Hybrid Battery SOC" to increase.
Leaving the vehicle with neutral (N) selected will cause the HV battery to discharge and the value of "Hybrid Battery SOC" to decrease.
Turn the ignition switch off.
| Proceed to |
|---|
| NEXT |
NEXT
Click hereEngine / Hybrid System>HYBRID / BATTERY CONTROL>HV BATTERY STACK>REMOVAL
| Proceed to |
|---|
| NEXT |
NEXT
Turn the ignition switch on (READY).
Drive the vehicle on urban roads for approximately 10 minutes.
Perform this procedure in order to ensure the accuracy of the inspection in the next step.
Turn the ignition switch off.
| Proceed to |
|---|
| NEXT |
NEXT
Connect the GTS to the DLC3.
Turn the ignition switch on (IG).
Turn the GTS on.
Enter the following menus: Powertrain / HV Battery / Data List / Delta SOC.
Check and Record the Data List.
| Tester Display |
|---|
| Hybrid/EV Battery SOC |
| Result | Proceed to |
|---|---|
| "Delta SOC" is 0 to 5% | A |
| Other than above | B |
| Tester Display |
|---|
| Delta SOC |
Turn the ignition switch off.
A
B
According to the value of Data List item "Delta SOC" recorded in the previous step, equalize the SOC.
| "Delta SOC" | Time to Equalize SOC
(Total time necessary to leave ignition switch off) |
|---|---|
| 6 to 10% | 29 hours |
| 11 to 15% | 49 hours |
| 16 to 20% | 66 hours |
| 21 to 25% | 85 hours |
| 26 to 30% | 103 hours |
SOC equalization is performed when the ignition switch is off.
It is not necessary to leave the ignition switch off continuously for the time shown in the table. The time shown is the cumulative time the ignition switch must be off after a hybrid vehicle supply stack sub-assembly has been replaced for SOC equalization to complete.
| Proceed to |
|---|
| NEXT |