Home › Engine / Hybrid System › 1KR-FE (EMISSION CONTROL) › PCV VALVE › from 2020.07
RM36W0E _51 Engine / Hybrid System _090964 1KR-FE EMISSION CONTROL _0431153 PCV VALVE A

1KR-FE EMISSION CONTROL  PCV VALVE  INSTALLATION  


PROCEDURE

Hide 12204A 1.INSTALL VENTILATION SYSTEM GROMMET

a.

Install the ventilation system grommet to the cylinder head cover sub-assembly.


Hide 12204 2.INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY)

a.

Install the PCV valve (ventilation valve sub-assembly) to the ventilation system grommet.


Hide 12261 3.CONNECT VENTILATION HOSE

a.

Connect the ventilation hose to the PCV valve (ventilation valve sub-assembly) and slide the hose 2 clips to secure it.


Hide 4.INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE