2005-2008 Yaris · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Aug 2005


1. INSTALL PURGE VSV

  1. A104846
    Install the purge VSV with the bolt.

    Torque:
    8.8 N*m{ 90 kgf*cm , 78 in.*lbf }

  1. A104804E02
    Connect fuel vapor feed hose No. 1 (b) with the clip.

  1. Connect fuel vapor feed hose No. 2 (c) with the clip.

  1. Connect the purge VSV connector (b).


2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
5.4 N*m{ 55 kgf*cm , 48 in.*lbf }

← INSPECTION (from Aug 2005)PRECAUTION (from Nov 2005) →