2005-2008 Yaris · Service Manual HEATER & AIR CONDITIONING SYSTEM

INSTALLATION

Removal / installation · Vehicles built from Jan 2006


1. CONNECT AIR INLET DAMPER CONTROL CABLE SUB-ASSEMBLY

I102570
  1. Engage the 2 claws and connect the air inlet damper control cable.


2. CONNECT DEFROSTER DAMPER CONTROL CABLE SUB-ASSEMBLY

I102569
  1. Engage the 2 claws and connect the defroster damper control cable.


3. CONNECT AIR MIX DAMPER CONTROL CABLE SUB-ASSEMBLY

I102568
  1. Engage the 2 claws and connect the air mix control cable clamp.

  1. Connect the air mix damper control cable to the clamp.


4. INSTALL AIR CONDITIONING PANEL ASSEMBLY

I102567
  1. Connect the 3 connectors and the 4 clamps.

  1. I102566
    Engage the 4 clips and 2 claws and install the air conditioning panel.


5. INSTALL INSTRUMENT CLUSTER FINISH PANEL CENTER SUB-ASSEMBLY

B132395
  1. Engage the 4 clips and 2 claws and install the instrument cluster finish panel.


6. INSTALL INSTRUMENT CLUSTER FINISH PANEL

E116833
  1. Fit the 2 claws of the instrument cluster finish panel into the upper instrument cluster finish panel center.

  1. E116834
    Engage the 5 claws and 5 clips and install the instrument cluster finish panel.


7. INSTALL INSTRUMENT PANEL FINISH PANEL END RH

B132318
  1. Engage the 6 claws and 3 clips and install the instrument panel finish panel end RH.


8. INSTALL INSTRUMENT PANEL FINISH PANEL END LH

B132317
  1. Engage the 6 claws and 3 clips and install the instrument panel finish panel end LH.


9. INSTALL INSTRUMENT PANEL FINISH PANEL LOWER CENTER

B132316
  1. Engage the 2 claws and 2 clips and install the instrument panel finish panel lower center.


10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
5.4 N*m{ 55 kgf*cm , 48 in.*lbf }