INSTALLATION
Removal / installation · Vehicles built from Aug 2005
- HINT:
- The procedure described below is for the LH side. Use the same procedure for both the RH and LH sides, unless otherwise specified.
| 1. INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP |
![]() ![]() |
- NOTICE:
- Only follow this procedure when replacing the clips.
Remove the tape that remains on the moulding surface of the vehicle body, then clean the surface with a non-residue solvent.
Using an infrared light, heat the clip installation surface of the vehicle body and roof drip side finish moulding.
Heating Temperature: Area
Temperature
Vehicle Body
40 to 60°C (104 to 140°F)
Roof Drip Side Finish Moulding
20 to 30°C (68 to 86°F)
- NOTICE:
- Do not excessively heat the vehicle body or roof drip side finish moulding.
Install new clips in the positions shown in the illustration. Press in the clips by hand.
Specification: Area
Measurement
a
35.4 mm (1.394 in.)
b
0.8 mm (0.032 in.)
c
1.6 mm (0.063 in.)
d
24 mm (0.945 in.)
e
0.5 mm (0.02 in.)
f
2.7 mm (0.106 in.)
- NOTICE:
- After pressing in the clips, wait 30 minutes or more before installing the roof drip side finish moulding.
- HINT:
- Minimum hardening time: 30 minutes
- Time needed for complete hardening: 24 hours
- Minimum hardening time: 30 minutes
| 2. INSTALL ROOF DRIP SIDE FINISH MOULDING |
Engage the 2 clips and install the roof drip side finish moulding.

Remove the protective tape.


